Line 19: Line 19:
 * Oplev:  * RT model
  * Cable connection is almost done.
  * Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
  * BS model will be splitted and one of them will be down sampled to 4kHz.
Line 21: Line 24:
 * Oplev: Ushiba
  * Test mas calibration was done.
  * Length oplev is not ready yet.
  * Marionette Oplev will be calibrated when door closed.
Line 23: Line 30:
  * Started using IMC as training of calibration.
   * Simple calibration will be implemented.
  * X end PD i
s removed at 3/27 today.

 * RT model
  * RT calibration using IMC as training of calibration will be tested soon.
  * Off line calibration using FIR filter won't be used in phase 1.

Minute of KAGRA commissioning meeting


  • Date: 2018/4/3 11AM~12PM
  • Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi
    • eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura


1. Report of work of the last week and plan of work

  • IFO: Izumi
    • Beam from both X and Y end was confirmed at REFL port.
  • ETMs: Ushiba
    • ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
    • ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
  • RT model
    • Cable connection is almost done.
    • Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
    • BS model will be splitted and one of them will be down sampled to 4kHz.
  • Oplev: Ushiba
    • Test mas calibration was done.
    • Length oplev is not ready yet.
    • Marionette Oplev will be calibrated when door closed.
  • CAL: Yamamoto, Yokozawa
    • RT calibration using IMC as training of calibration will be tested soon.
    • Off line calibration using FIR filter won't be used in phase 1.
  • DAQ

2. IFO check list

  • It will be prepared soon.

3. Operation

  • Please reply accommodation mail from Uchiyama-san.
  • Think for emergency.

4. Tasks or discussions

  • DAQ fix -> Miyakawa, Yamamoto

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

  • Frequency noise can be measured by middle lock. Large intensity noise can be a problem.

Others

  • Pump down meeting meeting: 4/5, 4/11
  • Next meeting: 4/10