= Minute of KAGRA commissioning meeting = ---- * Date: 2018/4/17 11AM~12PM * Attendance: Miyakawa, Kokeyama, Aso, Uchiyama, Miyoki, Akutsu * eZuce: Yamamoto, Suzuki, Shoda, Nagano ----- == 1. Report of work of the last week and plan of work == * VAC: * Door was closed and pump down started. One large leak was found and it is being searched where it is. * IFO, ETMs: Enomono, Ushiba * Michelson fringe was seen on DC and RF, but still mirror motion is too large. * Needs more work for damping for both ETMs, L2P of BS. * DGS: * IO chassis of k1ioo was disconnected somehow. It is being checked now. * DAQ: * Recoding minute_raw of k1fw1 moved to SSD at k1tw1. All fw0,1 tw0,1 are working well without any gap on data. == 2. Operation == * Noise injection needs some preparations for speakers. * Schnupp asymmetry need some preparations. * Other plan seems to be ready. * CBC will perform an online analysis. == 3. Tasks or discussions == * Selection of full channel -> DGS Yamamoto * Selection of science channel -> Commissioning Izumi * Screens at control room * Sensitivity. * PEM. * Needs laser safety information. * GW alert: online alert in the control room might be prepared. -> Togoshi == Others == * Laser power of oplev started dropping, specially lasers where are close to cryostat for year term. * Phase 1 summarize should talk wide range view. * Type A has double stable point. * Monitor for water level, and vacuum gage for weekend should be implemented. * Patrol light should be implemented soon, even manual one. * Next meeting: 4/24