Size: 1480
Comment:
|
Size: 853
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* eZuce: Suzuki, Uchiyama, Takahaashi, Ohashi | * eZuce: Suzuki, Uchiyama, Takahaashi, Ohashi, Haino, Shoda, Nakano |
Line 13: | Line 13: |
* Duty cycle is 80-90%. |
* Duty cycle is 80-90%. * iMC is quite stable. * DAC of PR3 was dead. That was the biggest trouble. |
Line 18: | Line 19: |
* IFO, ETMs: Enomono, Ushiba * Michelson fringe was seen on DC and RF, but still mirror motion is too large. * Needs more work for damping for both ETMs, L2P of BS. |
* IFO, ETMs: *Izumi, Enomono * Alignment work is mainly done. 3 DOF of alignment is contolled * Typical locking time is ~several hours. Longest was 10 hours or something. * iKAGRA Guardian code was mainly reused and modified. |
Line 22: | Line 24: |
* DGS: * IO chassis of k1ioo was disconnected somehow. It is being checked now. * DAQ: * Recoding minute_raw of k1fw1 moved to SSD at k1tw1. All fw0,1 tw0,1 are working well without any gap on data. == 2. Operation == * Noise injection needs some preparations for speakers. * Schnupp asymmetry need some preparations. * Other plan seems to be ready. * CBC will perform an online analysis. |
|
Line 41: | Line 29: |
* GW alert: online alert in the control room might be prepared. -> Togoshi |
|
Line 45: | Line 31: |
* Laser power of oplev started dropping, specially lasers where are close to cryostat for year term. | |
Line 47: | Line 32: |
* Phase 1 summarize should talk wide range view. * Type A has double stable point. * Monitor for water level, and vacuum gage for weekend should be implemented. * Patrol light should be implemented soon, even manual one. |
* Baffle at ETMX will be black coated. |
Line 52: | Line 34: |
* Next meeting: 4/24 | * Next meeting: 5/8. |
Minute of KAGRA commissioning meeting
- Date: 2018/5/1 11AM~12PM
- Attendance: Miyakawa, Kokeyama, Aso, Miyoki, Ushiba, Tomaru
- eZuce: Suzuki, Uchiyama, Takahaashi, Ohashi, Haino, Shoda, Nakano
1. Operation
- Going well.
- Duty cycle is 80-90%.
- iMC is quite stable.
- DAC of PR3 was dead. That was the biggest trouble.
2. Report of work of the last week and plan of work
- IFO, ETMs: *Izumi, Enomono
- Alignment work is mainly done. 3 DOF of alignment is contolled
- Typical locking time is ~several hours. Longest was 10 hours or something.
- iKAGRA Guardian code was mainly reused and modified.
3. Tasks or discussions
- 5/28 extend chief meeting for looking back phase 1.
Others
- Baffle at ETMX will be black coated.
- Next meeting: 5/8.