Size: 940
Comment:
|
← Revision 24 as of 2018-05-08 12:20:02 ⇥
Size: 1886
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa * eZuce: |
* Attendance: Miyakawa, Yamamoto, Aso * eZuce: Suzuki, Hirose, Yokozawa, Izumi, Ushiba |
Line 10: | Line 9: |
== 1. Report of work of the last week and plan of work == | == 1. Discussion after operation == |
Line 12: | Line 11: |
* IFO, ETMs: *Izumi, Enomono | * IFO, ETMs: Izumi, Yamamoto * Well done! Duty cycle is 80-90% in 1-5days, and 15-60% in 6-9days. * IMC was quite stable. * ETMY was dominant for stability of IFO in the last 4 days. * Optical gain fluctuated 20~30% due to the contrast defect. * BS coupling between L to P and Y was sometimes dominant for the contrast. * Error of Sunup asymmetry was also dominant by optical gain. |
Line 14: | Line 19: |
* DAQ * DAC of PR3 was dead. Restarting k1pr3 fixed this problem. We are not sure the cause. * Timing of dc0 sometimes shifted. Restart daqd of k1dc0 fixed this problem. We are not sure the cause. * Diaggui calculates float and sometimes coherence could not be measured. * We switched VIS models to 2kHz to avoid glitches. |
|
Line 15: | Line 25: |
== 2. Discussion after the phase 1 including operation == | * Satellite box should be replaced to have more capacitance. |
Line 17: | Line 27: |
* Well done! * Duty cycle is 80-90% in 1-4days, and 15-60% in 5-9days. * IMC was quite stable. |
== 2. Discussion after phase1 == |
Line 21: | Line 29: |
* Troubles: * ETMY * ETMX * IFO * CAL * DAQ * DAC of PR3 was dead. That was the biggest trouble. * VAC * CRY |
* ETM leak was triggered 1week delay. * Records of opening flange are very important. * Manual for VIS and clean booth should be prepared. * Mirror schedule should be checked frequently. * Optimization of Each DOF of VIS takes 1 day, full VIS take 22 days. * Hammaring test of ETMY showed that something hitting. * Cable was well placed for ETMX. Fixing ETMY should be scheduled. (Ushiba) * Heat link might be causes of fluctuation. It should be compared with ETMX. * Needs ETMX cleaning. (Aso, Izumi, Hirose) * TF of ETMY BF should be measured. (Izumi) * Cross coupling of ETMY was large. (Izumi) |
Line 34: | Line 46: |
* |
* Name of "Stage" should be replaced. |
Line 38: | Line 48: |
== 3. Tasks or discussions == |
|
Line 45: | Line 53: |
* Baffle at ETMX will extracted in the week of 5/7, and it will be black coated. * Next meeting: 5/8. == 1. Discussion after the phase 1 including operation == * IFO * LSC, CAL etc. * damping * DAQ *Cryogenic * Vacuum |
* Next meeting: 5/15. |
Minute of KAGRA commissioning meeting
- Date: 2018/5/8 11AM~12PM
- Attendance: Miyakawa, Yamamoto, Aso
- eZuce: Suzuki, Hirose, Yokozawa, Izumi, Ushiba
1. Discussion after operation
- IFO, ETMs: Izumi, Yamamoto
- Well done! Duty cycle is 80-90% in 1-5days, and 15-60% in 6-9days.
- IMC was quite stable.
- ETMY was dominant for stability of IFO in the last 4 days.
- Optical gain fluctuated 20~30% due to the contrast defect.
- BS coupling between L to P and Y was sometimes dominant for the contrast.
- Error of Sunup asymmetry was also dominant by optical gain.
- DAQ
- DAC of PR3 was dead. Restarting k1pr3 fixed this problem. We are not sure the cause.
- Timing of dc0 sometimes shifted. Restart daqd of k1dc0 fixed this problem. We are not sure the cause.
- Diaggui calculates float and sometimes coherence could not be measured.
- We switched VIS models to 2kHz to avoid glitches.
- Satellite box should be replaced to have more capacitance.
2. Discussion after phase1
- ETM leak was triggered 1week delay.
- Records of opening flange are very important.
- Manual for VIS and clean booth should be prepared.
- Mirror schedule should be checked frequently.
- Optimization of Each DOF of VIS takes 1 day, full VIS take 22 days.
- Hammaring test of ETMY showed that something hitting.
- Cable was well placed for ETMX. Fixing ETMY should be scheduled. (Ushiba)
- Heat link might be causes of fluctuation. It should be compared with ETMX.
- Needs ETMX cleaning. (Aso, Izumi, Hirose)
- TF of ETMY BF should be measured. (Izumi)
- Cross coupling of ETMY was large. (Izumi)
3. Phase 2
- Each stage and target
- Name of "Stage" should be replaced.
- 5/28 extend chief meeting for looking back phase 1.
Others
- Next meeting: 5/15.