= Minute of KAGRA commissioning meeting = ---- * Date: 2018/5/8 11AM~12PM * Attendance: Miyakawa, Yamamoto, Aso * eZuce: Suzuki, Hirose, Yokozawa, Izumi, Ushiba ----- == 1. Discussion after operation == * IFO, ETMs: Izumi, Yamamoto * Well done! Duty cycle is 80-90% in 1-5days, and 15-60% in 6-9days. * IMC was quite stable. * ETMY was dominant for stability of IFO in the last 4 days. * Optical gain fluctuated 20~30% due to the contrast defect. * BS coupling between L to P and Y was sometimes dominant for the contrast. * Error of Sunup asymmetry was also dominant by optical gain. * DAQ * DAC of PR3 was dead. Restarting k1pr3 fixed this problem. We are not sure the cause. * Timing of dc0 sometimes shifted. Restart daqd of k1dc0 fixed this problem. We are not sure the cause. * Diaggui calculates float and sometimes coherence could not be measured. * We switched VIS models to 2kHz to avoid glitches. * Satellite box should be replaced to have more capacitance. == 2. Discussion after phase1 == * ETM leak was triggered 1week delay. * Records of opening flange are very important. * Manual for VIS and clean booth should be prepared. * Mirror schedule should be checked frequently. * Optimization of Each DOF of VIS takes 1 day, full VIS take 22 days. * Hammaring test of ETMY showed that something hitting. * Cable was well placed for ETMX. Fixing ETMY should be scheduled. (Ushiba) * Heat link might be causes of fluctuation. It should be compared with ETMX. * Needs ETMX cleaning. (Aso, Izumi, Hirose) * TF of ETMY BF should be measured. (Izumi) * Cross coupling of ETMY was large. (Izumi) == 3. Phase 2 == * Each stage and target * Name of "Stage" should be replaced. * 5/28 extend chief meeting for looking back phase 1. == Others == * Next meeting: 5/15.