Line 16: Line 16:
 * Do we need WFS?(Eleonora) -> Yes, with control system.(Kiwamu)
 * Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi)
 * Gouy phase measurement for green is also necessary. (Akutsu)
 * Both mirrors are at the room temperature. (Uchiyama)
 * Needs preparation list. (Aso)
 * Loss measurement will performed mainly reflection light. (Izumi)
 * Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto
 * Camera view? (Stefan) -> PCal camera, transmitted camera
 * Which port will be used for locking? (Miyakawa) -> REFL port

Minute of KAGRA commissioning meeting


  • Date: 2018/6/5 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Aso, Yamamoto, Yokozawa, Enomoto, Stefan
    • eZuce: Izumi, Nakano, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Ushiba, Eleonora, Shoda, Tegoshi


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

1. X arm commissioning

  • JGW-T1808343

  • Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi)

  • Gouy phase measurement for green is also necessary. (Akutsu)
  • Both mirrors are at the room temperature. (Uchiyama)
  • Needs preparation list. (Aso)
  • Loss measurement will performed mainly reflection light. (Izumi)
  • Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto

  • Camera view? (Stefan) -> PCal camera, transmitted camera

  • Which port will be used for locking? (Miyakawa) -> REFL port

2. New 40 W laser

3. PMC electronic hack

Others

  • Next meeting: 5/29.