Differences between revisions 5 and 6
Revision 5 as of 2018-06-05 11:32:51
Size: 1473
Comment:
Revision 6 as of 2018-06-05 11:41:17
Size: 1556
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8343|JGW-T1808343]]   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8343|JGW-T1808343]]
Line 28: Line 28:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5055]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5124]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5126]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5055]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5124]]
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5126]]

  * Non-stational noise happens but it is not related water cooler.
  *

Minute of KAGRA commissioning meeting


  • Date: 2018/6/5 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Aso, Yamamoto, Yokozawa, Enomoto, Stefan
    • eZuce: Izumi, Nakano, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Ushiba, Eleonora, Shoda, Tegoshi


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

1. X arm commissioning

  • Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi)

  • Gouy phase measurement for green is also necessary. (Akutsu)
  • Both mirrors are at the room temperature. (Uchiyama)
  • Needs preparation list. (Aso)
  • Loss measurement will performed mainly reflection light. (Izumi)
  • Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto

  • Camera view? (Stefan) -> PCal camera, transmitted camera

  • Which port will be used for locking? (Miyakawa) -> REFL port

2. New 40 W laser

3. PMC electronic hack

Others

  • Next meeting: 5/29.

KAGRA/Commissioning/Weekly/20180605/Minute (last edited 2018-06-05 12:04:48 by OsamuMiyakawa)