Line 44: Line 44:
 *  * MATSUSADA HV driver has 10uV/rHz, quite high.
 * Slow output can be used as offset, and 2nd EXC point will be used as input.
 * LIGO is not using temperature controller. (Stefan)

Minute of KAGRA commissioning meeting


  • Date: 2018/6/5 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Aso, Yamamoto, Yokozawa, Enomoto, Stefan
    • eZuce: Izumi, Nakano, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Ushiba, Eleonora, Shoda, Tegoshi


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

1. X arm commissioning

  • Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi)

  • Gouy phase measurement for green is also necessary. (Akutsu)
  • Both mirrors are at the room temperature. (Uchiyama)
  • Needs preparation list. (Aso)
  • Loss measurement will performed mainly reflection light. (Izumi)
  • Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto

  • Camera view? (Stefan) -> PCal camera, transmitted camera

  • Which port will be used for locking? (Miyakawa) -> REFL port

2. New 40 W laser

3. PMC electronic hack

  • MATSUSADA HV driver has 10uV/rHz, quite high.
  • Slow output can be used as offset, and 2nd EXC point will be used as input.
  • LIGO is not using temperature controller. (Stefan)

Others

  • Next meeting: 5/29.

KAGRA/Commissioning/Weekly/20180605/Minute (last edited 2018-06-05 12:04:48 by OsamuMiyakawa)