= Minute of KAGRA commissioning meeting = ---- * Date: 2018/6/5 11AM~12PM * Attendance: Miyakawa, Uchiyama, Aso, Yamamoto, Yokozawa, Enomoto, Stefan * eZuce: Izumi, Nakano, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Ushiba, Eleonora, Shoda, Tegoshi ----- == 0. Schedule == * k1ix0 will be needed by September for NAB PD. == 1. X arm commissioning == * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8343|JGW-T1808343]] * Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi) * Gouy phase measurement for green is also necessary. (Akutsu) * Both mirrors are at the room temperature. (Uchiyama) * Needs preparation list. (Aso) * Loss measurement will performed mainly reflection light. (Izumi) * Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto * Camera view? (Stefan) -> PCal camera, transmitted camera * Which port will be used for locking? (Miyakawa) -> REFL port == 2. New 40 W laser == * RIN measurement * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5055]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5124]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5126]] * Non-stational noise happens but it is not related water cooler. * This RIN level cannot reach shotnoise level with the first ISS loop. Current noise is 2 orders lager than NPRO noise. Needs 2nd loop to reach design level. * Beam profile * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5068]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5084]] - OSA measurement * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5139]] == 3. PMC electronic hack == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5155]] * MATSUSADA HV driver has 10uV/rHz, quite high. * Slow output can be used as offset, and 2nd EXC point will be used as input. * LIGO is not using temperature controller. (Stefan) == Others == * Next meeting: 5/29.