 * Attendance: Miyakawa, Aso, Yokozawa, Ohishi, Kokeyama, Miyoki
  * eZuce: Ushiba, Izumi, Inoue, Yamamoto(Toyama), Suzuki, Stefan
 * Attendance: Miyakawa, Aso, Yokozawa, Ohishi, Kokeyama, Miyoki, Tahara, Enomoto, Stefan, Tomura, Ushiyama, Nakano
  * eZuce: Ushiba, Izumi, Inoue, Yamamoto(Toyama), Suzuki, Hirose, Shoda
Line 13: Line 13:
== ETMX status == == Laser ==

 * Transmissivity of Faraday Isolator suddenly reduced 60% to 40%.
 * Starding Fiber amp failed due to too low power at the sensor.
 * We will use spare at Mio labs. We can use current low power laser, so schedule won't be changed so much.


== IMMT ==

 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5274]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5287]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5292]]

== PMC ==

 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5295]]

== Useful scripts for RT-models ==
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5282]]

Minute of KAGRA commissioning meeting


  • Date: 2018/6/19 11AM~12PM
  • Attendance: Miyakawa, Aso, Yokozawa, Ohishi, Kokeyama, Miyoki, Tahara, Enomoto, Stefan, Tomura, Ushiyama, Nakano
    • eZuce: Ushiba, Izumi, Inoue, Yamamoto(Toyama), Suzuki, Hirose, Shoda


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

Laser

  • Transmissivity of Faraday Isolator suddenly reduced 60% to 40%.
  • Starding Fiber amp failed due to too low power at the sensor.
  • We will use spare at Mio labs. We can use current low power laser, so schedule won't be changed so much.

IMMT

PMC

Useful scripts for RT-models

X arm commissioning/preparation

  • WFS target: 10nrad.

Satellite box modification

MC realignment

  • MC will be re-aligned today.

FSS BO

  • BO card was broken and it was replaced.
  • BO check card is still connected between BO card and circuit to break ground loop.

PMC installation, circuits, adding offset

Others

  • Next meeting: 6/19.