Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2018-06-26 10:56:03
Size: 813
Comment:
Revision 5 as of 2018-06-26 11:26:01
Size: 904
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa, Aso, Yokozawa, Ohishi, Kokeyama, Miyoki, Tahara, Enomoto, Stefan, Tomura, Ushiyama, Nakano
  * eZuce: Ushiba, Izumi, Inoue, Yamamoto(Toyama), Suzuki, Hirose, Shoda
 * Attendance: Miyakawa, Yokozawa, Stefan, Nakano, Yamamoto
  * eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama
Line 8: Line 8:

== Topic ==
Line 13: Line 11:
  * Two PZT steering mirrors were installed yesterday for input beam to IMC.
  * Calibration to Hz will be done today.
  * Thermal drive is sill missing.

Minute of KAGRA commissioning meeting


  • Date: 2018/6/26 11AM~12PM
  • Attendance: Miyakawa, Yokozawa, Stefan, Nakano, Yamamoto
    • eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama


PMC

Others

  • Beam height brain storming -> next week?

  • Necessary number of High power coil driver -> Aso

  • Next meeting: 7/3.

KAGRA/Commissioning/Weekly/20180626/Minute (last edited 2018-06-26 11:48:50 by OsamuMiyakawa)