Minute of KAGRA commissioning meeting
- Date: 2018/7/3 11AM~12PM
- Attendance: Miyakawa, Aso, Miyoki, Enomonoto, Yokozawa
- eZuce: Suzuki, Shoda, Hirose, Izumi, Yamamoto(Toyama), Ohashi, Kimura, Tomaru, Inoue
LAS
40W laser and RIN measurement -> Tahara, Nakano
- Noise floor increase with power increment.
- Movement to Kamioka will be the end of July.
ALS
VCO noise measurement -> Sugimoto, Enomoto
- Any good idea to control only high frequency? (Aso)
- 40MHz less noise VCO can be used for also high frequency.
Green Fiber Noise Measurement -> Sugimoto, Enomoto
- Transmissivity was 60% first, then reduced to 40%.
VIS
Geophone Noise Hunting -> Tanioka
AOS
WAB alignment and the final saving-mode -> Akutsu, Simon
rack cleaning
- Cable cleaning on BS rack will be done this weekend.
Others
Necessary number of High power coil driver -> Aso
NAB PD cabling -> Aso
- Beam height brain storming
- ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.
Others
- Next meeting: 7/17.