[1] https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing | * the readiness for the X arm commissioning. * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]] * Laser report -> Tahara * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5638]] * PSL, IOO report * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5606]] * Status of ETMX -> Miyamoto * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5613]] * Status of ITMX -> Ushiba * Item list of equipments for IXC -> Kimura * Control workstations at control room and in the mine -> Yamamoto * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5641]] |
2018/7/24 Commissioning meeting topics
- the readiness for the X arm commissioning.
Laser report -> Tahara
- PSL, IOO report
Status of ETMX -> Miyamoto
Status of ITMX -> Ushiba
Item list of equipments for IXC -> Kimura
Control workstations at control room and in the mine -> Yamamoto