Minute of KAGRA commissioning meeting


  • Date: 2018/7/17 11AM~12PM
  • Attendance: Miyakawa, Miyamoto, Aso, Nakano, Yokozawa
    • eZuce: Shoda, Izumi, Ushiba


Clipping loss (Izumi)

  • 20mm misalignment is acceptable for beam cetering.
  • 40mm misalignment is acceptable for WAB cetering.
  • Could be factor of 2 different in loss.

ETMX (Miyamoto)

  • Side of screw of frame was almost touching in the room temperature and after starting cooling it was actually touching.
  • Then it was found that F2 was almost dead. Even VIS team pulled wire but LVDT did not work.
  • Then pump down started without F2 fix.
  • New measurement shows it seems to be OK except for 2.4Hz peak probably due to the dead of F2.
  • Cooling started the last Friday.
  • Heat link does not affect so much.

LAS

  • Fiber was broken just before moving the laser to Kamioka.
  • We have 1 + 1spare = 2.
  • Low power below 15A has many peaks.
  • Low frequency RIN is proportional to the power.
  • Movement to Kamioka will be the 24th of July.

PSL

  • PMC and iMC layout including MZ is being changed.

rack cleaning

  • Cable cleaning on BS rack is being continued.
  • pile of AA or HPCD can be hot.

Others

  • Next meeting: 7/24.