Line 22: Line 22:
  * UGF is currently 10kHz. Above 1kHz, suppression is not enough. It will be limited to 50kHz max in future by AOM driver.   * UGF is currently 10kHz. Above 1kHz, suppression is not enough. It will be limited to 50kHz max in future by a commercial AOM driver of speed of variable attenuator..
Line 25: Line 25:
MZ alignment is being proceeded, and MC has been already locked with single arm of MZ.
 * Mode matching ratio is still bad but it will be fixed soon.

== ISS ==
 * ISS loop locked again. OLG or RIM was measured, and they are being analyzed.
== Check list for IXC ==
 
 * Meeting will be assigned on one of 8/15,16,17.
 * WAB, NAB are the additional items.
 * Mirror position should be in the item list.
 * WAB PD will be installed at the sometime.
Line 32: Line 33:

== IMMT2 (Ohishi) ==

 * On 7/9, we started take IMMT out from the chamber.
 * All the replacement of magnetized screws is done by the end of last week.
 * Mirror position (distance between mirror and coile) was shifted a ~mm, probably caused by tilt of optical.
 * TF will be measured soon.

== ACC noise ==
 * Old circuits are still used in TAMA era, and all the noise floor are high.

Minute of KAGRA commissioning meeting


  • Date: 2018/7/24 11AM~12PM
  • Attendance: Miyakawa, Aso, Enomoto, Yokozawa, Kozakai
    • eZuce: Miyoki, Suzuki, Nakano, Shoda, Ushiba, Yamamoto, Kimura, Uchiyama


LAS (Nakano)

  • 40W laser started working on last Friday.
    • Limite 1W will be used to alignment or so.
  • Remote desktop will be installed on Windows PC for 40W laser control.
  • Monitor of laser power should be displayed on door or something.

PSL, IOO

  • MZ of single arm mode matching is much better now. No Lager-Gaussian is seen.
    • MZ contrast is 99.4% and 96.9%. Second one has 3m arm length difference.
    • Lock wil be tried soon. Common mode servo will be used to control MZ.
  • RAM(residual amplitude monitor) monitor will be installed.
  • ISS TF model and measurement were done. Model still does not have phase delay at high frequency.
  • RIN is limited by PD dark noise up to 1kHz. Shotnoise is almost comparable.
    • UGF is currently 10kHz. Above 1kHz, suppression is not enough. It will be limited to 50kHz max in future by a commercial AOM driver of speed of variable attenuator..

Check list for IXC

  • Meeting will be assigned on one of 8/15,16,17.
  • WAB, NAB are the additional items.
  • Mirror position should be in the item list.
  • WAB PD will be installed at the sometime.

ETMX (Miyamoto)

Geophone

  • To fix BS GeoPhone, we should open the chamber.

  • TMS GeoPhone looks fine, but some strange coupling can be seen in the TF measurement.

    • Feedback bandwidth is limited ~10Hz.

DGS

  • DAC is almost out of stock. We should think to start using old DAC used in CLIO.

rack cleaning

Others

  • Next meeting: 7/31.