⇤ ← Revision 1 as of 2018-08-21 11:38:17
Size: 1197
Comment:
|
← Revision 2 as of 2018-08-21 12:04:07 ⇥
Size: 1294
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* eZuce: Kimura, Yokozawa, Uchiyama, Izumi, Haino | * eZuce: Kimura, Yokozawa, Uchiyama, Izumi, Haino, Darken |
Line 32: | Line 32: |
== Buffle PD == * It was recovered all the PDs attached again to the black plate. |
Minute of KAGRA commissioning meeting
- Date: 2018/8/7 11AM~12PM
- Attendance: Miyakawa, Aso, Yamamoto, Kokeyama
- eZuce: Kimura, Yokozawa, Uchiyama, Izumi, Haino, Darken
PSL, IOO (Kokeyama)
- PMC is influenced by KOACH filters.
- MZ has been locked with output RF modulations.
- RAM monitor can be measured at local tools. It will be connected to monitor system at the control room.
- FSS was recovered with new laser.
- IMMT2 had bad coil, it will be repaired.
- High power laser will be out around September in the PLS after safety. Beam dump will be installed 12/3 then real high power laser is provided to IFO.
Daily meeting
- It started 8/20 1PM.
Night work
- It will start 9/3.
- Izumi, Enomoto, Yamamoto, Eleonora, Miyazaki, Takeda, Kita, Midooka
ALS
- 70-80% at optical table in the PSL room is done.
- Beam reached to POP table.
- One of laser is not healthy. Low power operation is temporarily OK. Spare will be purchased soon.
- Needs little more time for electronics.
- Trasmittance was 50-60% for optical fiber.
Buffle PD
- It was recovered all the PDs attached again to the black plate.
Others
- Next meeting: 8/21.