= Minute of KAGRA commissioning meeting = ---- * Date: 2018/8/7 11AM~12PM * Attendance: Miyakawa, Aso, Yamamoto, Kokeyama * eZuce: Kimura, Yokozawa, Uchiyama, Izumi, Haino, Darken ----- == PSL, IOO (Kokeyama) == * PMC is influenced by KOACH filters. * MZ has been locked with output RF modulations. * RAM monitor can be measured at local tools. It will be connected to monitor system at the control room. * FSS was recovered with new laser. * IMMT2 had bad coil, it will be repaired. * High power laser will be out around September in the PLS after safety. Beam dump will be installed 12/3 then real high power laser is provided to IFO. == Daily meeting == * It started 8/20 1PM. == Night work == * It will start 9/3. * Izumi, Enomoto, Yamamoto, Eleonora, Miyazaki, Takeda, Kita, Midooka * https://teamup.com/kswnmta8p18h6u1uab == ALS == * 70-80% at optical table in the PSL room is done. * Beam reached to POP table. * One of laser is not healthy. Low power operation is temporarily OK. Spare will be purchased soon. * Needs little more time for electronics. * Trasmittance was 50-60% for optical fiber. == Buffle PD == * It was recovered all the PDs attached again to the black plate. == Others == * Next meeting: 8/21.