⇤ ← Revision 1 as of 2018-08-28 11:32:40
Size: 224
Comment:
|
← Revision 2 as of 2018-08-28 11:50:16 ⇥
Size: 409
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* Yarm area will be blocked from the laser all the day by aluminum foil and separators. * Satellite amplifier has 30db whitening filter from 0.1 to 10Hz at PD sensor output for OSEM. |
Minute of KAGRA commissioning meeting
- Date: 2018/8/28 11AM~12PM
- Attendance: Miyakawa, Aso, Yokozawa, Yamamoto
- eZuce: Takahashi, Ushiba, Uchiyama
- Yarm area will be blocked from the laser all the day by aluminum foil and separators.
- Satellite amplifier has 30db whitening filter from 0.1 to 10Hz at PD sensor output for OSEM.
Others
- Next meeting: 9/4.