Size: 666
Comment:
|
← Revision 3 as of 2018-09-18 11:50:09 ⇥
Size: 839
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Izumi, Yamamoto, Oshino, Aso * eZuce: Yokozawa, Suzuki, Ushiba |
* Attendance: Miyakawa, Izumi, Yamamoto, Yokozawa, Izumi, Aso, Kozakai * eZuce: Hirose, Miyoki, Yamamoto(Toyama), Uchiyama, Kimura, Ushiba |
Line 13: | Line 13: |
=== |
* Oplev for ITMX is very important. Please DO NOT KICK them. |
Line 18: | Line 17: |
* It was difficult to take a rest or dinner. * Needs staff assignment for the night work. * car sharing |
* Eating inside mine is still prohibited. * Needs 2 cars for Locomotion and 1 or 2 cars for Yuki house. * The number of driver is not enough. |
Line 24: | Line 23: |
* Commissioning team will send e-mail by 9pm on Thursday whether they will work on Saturday or not. | * Power check will be once per 3 years. |
Line 26: | Line 25: |
=== IOO === * Seems to be stable for PMC, IMC. * DAC outputs were gone this morning. |
|
Line 27: | Line 29: |
=== ETMX === * Cross talk on ETMX is caused by grounding of High power coil driver. |
=== DGS === * IRIG-B 999xx issue was fixed. * HIB card on k1lsc seems to be dead. |
Line 33: | Line 35: |
* Next meeting: 9/11. | * Next meeting: 9/25. |
Minute of KAGRA commissioning meeting
- Date: 2018/9/18 11AM~12PM
- Attendance: Miyakawa, Izumi, Yamamoto, Yokozawa, Izumi, Aso, Kozakai
- eZuce: Hirose, Miyoki, Yamamoto(Toyama), Uchiyama, Kimura, Ushiba
X arm alignment
- Schedule looks fine for this and next week.
- Oplev for ITMX is very important. Please DO NOT KICK them.
Night work
- Eating inside mine is still prohibited.
- Needs 2 cars for Locomotion and 1 or 2 cars for Yuki house.
- The number of driver is not enough.
Power outage
- Power check will be once per 3 years.
IOO
- Seems to be stable for PMC, IMC.
- DAC outputs were gone this morning.
DGS
- IRIG-B 999xx issue was fixed.
- HIB card on k1lsc seems to be dead.
Others
- Next meeting: 9/25.