Size: 649
Comment:
|
Size: 804
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== 2018/10/2 Commissioning meeting topics == | = Minute of KAGRA commissioning meeting = ---- |
Line 3: | Line 4: |
* Readiness for the X arm commissioning. * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]] |
* Date: 2018/10/2 11AM~12PM * Attendance: Miyakawa, Yamamoto, Yokozawa, Kozakai, Kokeyama * Zoom: Ushiba, Suzuki |
Line 6: | Line 8: |
---- * Summary of Alignment of September |
----- |
Line 9: | Line 10: |
* Trouble of ITMX * Trouble of PR2 and PR3 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6291]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6323]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6335]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6348]] |
=== X arm alignment === |
Line 16: | Line 12: |
* Laser, PSL, IOO report * Report of laser down on 9/29: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6345]] |
* Beam is returned back to central area from ETMX! * Waiting for ITMX fixed. |
Line 19: | Line 16: |
* Picomotor * EPICS gateway |
=== Trouble of ITMX === === Trouble of PR2 and PR3 === === IOO === * Seems to be stable for PMC, IMC. * 5W will be out in the PSL. === Picomotor === * New driver seemed to be not working. Miyo-kun tried it in other network, the it worked. * Trouble might be network traffic in kAGRA control. === DGS === * EPICS gateway has been implemented. Network traffic should be much smaller now (~1/10). * Still not perfect. Needs more tuning. == Others == * Next meeting: 10/9. |
Minute of KAGRA commissioning meeting
- Date: 2018/10/2 11AM~12PM
- Attendance: Miyakawa, Yamamoto, Yokozawa, Kozakai, Kokeyama
- Zoom: Ushiba, Suzuki
X arm alignment
- Beam is returned back to central area from ETMX!
- Waiting for ITMX fixed.
Trouble of ITMX
Trouble of PR2 and PR3
IOO
- Seems to be stable for PMC, IMC.
- 5W will be out in the PSL.
Picomotor
- New driver seemed to be not working. Miyo-kun tried it in other network, the it worked.
- Trouble might be network traffic in kAGRA control.
DGS
- EPICS gateway has been implemented. Network traffic should be much smaller now (~1/10).
- Still not perfect. Needs more tuning.
Others
- Next meeting: 10/9.