Size: 719
Comment:
|
← Revision 7 as of 2018-10-02 11:30:17 ⇥
Size: 905
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Izumi, Yamamoto, Yokozawa, Izumi, Aso, Kozakai * eZuce: Hirose, Miyoki, Yamamoto(Toyama), Uchiyama, Kimura, Ushiba |
* Attendance: Miyakawa, Yamamoto, Yokozawa, Kozakai, Kokeyama * Zoom: Ushiba, Suzuki, Enomoto |
Line 14: | Line 14: |
* Oplev moved somehow. It is not clear why. | |
Line 24: | Line 25: |
* DAC outputs were gone this morning. | * 5W will be out in the PSL. |
Line 27: | Line 28: |
* New driver seemed to be not working. Miyo-kun tried it in other network, the it worked. * Trouble might be network traffic in kAGRA control. |
|
Line 33: | Line 36: |
=== CAL === * Installation of periscope. |
Minute of KAGRA commissioning meeting
- Date: 2018/10/2 11AM~12PM
- Attendance: Miyakawa, Yamamoto, Yokozawa, Kozakai, Kokeyama
- Zoom: Ushiba, Suzuki, Enomoto
X arm alignment
- Beam is returned back to central area from ETMX!
- Waiting for ITMX fixed.
- Oplev moved somehow. It is not clear why.
Trouble of ITMX
Trouble of PR2 and PR3
IOO
- Seems to be stable for PMC, IMC.
- 5W will be out in the PSL.
Picomotor
- New driver seemed to be not working. Miyo-kun tried it in other network, the it worked.
- Trouble might be network traffic in kAGRA control.
DGS
- EPICS gateway has been implemented. Network traffic should be much smaller now (~1/10).
- Still not perfect. Needs more tuning.
CAL
- Installation of periscope.
Others
- Next meeting: 10/9.