2018/10/23 Commissioning meeting topics
- Assignment of staffs for night work
- Readiness for the X arm commissioning.
- X arm lock for green and IR flash
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6596: PLL automation
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6624: First lock
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6629: 7min lock
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6638: actuator limit
- Type A
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6593: Drift during pumping down, brief report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6611: ETMX-payload was sitting nicely
- Laser, PSL, IOO report
- OMC installation
- DGS
- Scheduling for maintenance time