== 2018/10/23 Commissioning meeting topics == * Assignment of staffs for night work * [[https://teamup.com/kswnmta8p18h6u1uab]] * Readiness for the X arm commissioning. * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]] ---- * 10/25 9AM-3PM: Leak check at ETMX * 10/30 PM for 30min : Inspection for cleanning * MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31? * Conflict between measurement of ITMs and commissioning -> Ask application for work of ITMs at the control room. ---- * X arm lock for green and IR flash * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6596]]: PLL automation * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6624]]: First lock * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6629]]: 7min lock * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6638]]: actuator limit * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6640]]: IR flash * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6654]]: OLTF * Type A * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6593]]: Drift during pumping down, brief report * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6611]]: ETMX-payload was sitting nicely * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6628]] * Laser, PSL, IOO report * OMC installation * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6536]] * DGS * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6648]]: Glitch * Scheduling for maintenance time