Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2018-10-29 16:21:12
Size: 1714
Comment:
Revision 3 as of 2018-10-29 17:21:14
Size: 1315
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * --(10/30 PM for 30min : Inspection for cleaning)--  * 11/6 AM or PM for 30min : Inspection for ETMX cleaning
 * 12/10 or 11 ETMX cleaning
Line 27: Line 28:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6638]]: actuator limit
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6640]]: IR flash
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6654]]: OLTF

 * Type A
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6593]]: Drift during pumping down, brief report
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6611]]: ETMX-payload was sitting nicely
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6628]]
Line 45: Line 38:

2018/10/30 Commissioning meeting topics


  • 11/6 AM or PM for 30min : Inspection for ETMX cleaning
  • 12/10 or 11 ETMX cleaning
  • MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31?


KAGRA/Commissioning/Weekly/20181030/Agenda (last edited 2018-10-30 10:11:26 by OsamuMiyakawa)