Size: 1315
Comment:
|
← Revision 5 as of 2018-10-30 10:11:26 ⇥
Size: 1390
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* 11/6 AM or PM for 30min : Inspection for ETMX cleaning * 12/10 or 11 ETMX cleaning |
* 11/5-end of Nov.: IYA root will be closed. * 11/6: AM or PM for 30min : Inspection for ETMX cleaning * 12/10 or 11: ETMX cleaning |
Line 14: | Line 14: |
* Assignment of tuning for suspensions. | |
Line 17: | Line 18: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6697]]: damping loop engaged | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6697]]: OLTF |
2018/10/30 Commissioning meeting topics
- Assignment of staffs for night work
- Readiness for the X arm commissioning.
- 11/5-end of Nov.: IYA root will be closed.
- 11/6: AM or PM for 30min : Inspection for ETMX cleaning
- 12/10 or 11: ETMX cleaning
- MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31?
- Assignment of tuning for suspensions.
- X arm lock
- ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6752: damping loop engaged
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6725: ETMX TM H2 coil dones not respond
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6731: Broken magnet?
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6741: Image of ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6742: Image of ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6749: Image of ETMX
- Laser, PSL, IOO report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6743: Broken AOM?
- OMC installation
- DGS
- Scheduling for maintenance time on Wednesday morning.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6732: picomotor