2018/10/30 Commissioning meeting topics
- Assignment of staffs for night work
- Readiness for the X arm commissioning.
10/30 PM for 30min : Inspection for cleaning
- MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31?
- X arm lock
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6697: damping loop engaged
- ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6752: damping loop engaged
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6725: ETMX TM H2 coil dones not respond
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6731: Broken magnet?
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6741: Image of ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6742: Image of ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6749: Image of ETMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6638: actuator limit
- Type A
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6593: Drift during pumping down, brief report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6611: ETMX-payload was sitting nicely
- Laser, PSL, IOO report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6743: Broken AOM?
- OMC installation
- DGS
- Scheduling for maintenance time on Wednesday morning.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6732: picomotor