Differences between revisions 1 and 2
Revision 1 as of 2018-11-20 10:39:02
Size: 933
Comment:
Revision 2 as of 2018-11-20 12:15:05
Size: 1141
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa, Aso, Kozakai, Lucia, Eleonora, Oshino, Miyokio
  * Zoom:
Suzuki, Nakano, Takahashi, Uchiyama, Ushiba
 * Attendance: Miyakawa, Aso, Enomoto, Izumi, Lucia
  * Zoom:
Kozakai, Yamamoto, Koseyama, Oshino, Suzuki, Yokozawa
Line 10: Line 10:
 * CAL injection on 11/26-29 won't affect to commissioning task.
 
Line 11: Line 13:
 * Y arm alignment starts after NAB installation on the week of 11/26, with IR laser only. === Discussion ===
 * We need 2weeks more.
 * Minimum success is stabilization of IR fluctuation to cavity resonant frequency.
Line 18: Line 23:
 * Laser, PSL, IOO report
  * At least more than 15W can be provided into the IFO!
  * 20% of loss of 30% can be explained by lossy 4 mirrors.
  * Report the incident to the Safety office.
 * Yarm commissioning
  * Nakano-kun, Eleonora lead the Y arm commissioning task, and Sugimoto-kun can join to Y arm team. Enzo and Type B team can work for commissioning work specially for BS and SR.
Line 24: Line 27:
 * DGS
  * Scheduling for maintenance time on Wednesday morning.
  * DAQ, k1iy1, k1ioo, k1imc0, k1lsc will be stopped.
 * Laser, PSL, IOO report
  * Characterization for PMC, IMC, FSS started. The results will be summerized to somewhere.
  * ISS noise hunting started. No difference was seen between KIKUSUI and KEPCO DC power supply.
Line 30: Line 34:
 * Next meeting: 11/20.  * Next meeting: 11/27.

Minute of KAGRA commissioning meeting


  • Date: 2018/11/20 11AM~12PM
  • Attendance: Miyakawa, Aso, Enomoto, Izumi, Lucia
    • Zoom: Kozakai, Yamamoto, Koseyama, Oshino, Suzuki, Yokozawa


Schedule

  • CAL injection on 11/26-29 won't affect to commissioning task.

Discussion

  • We need 2weeks more.
  • Minimum success is stabilization of IR fluctuation to cavity resonant frequency.


  • X arm lock
    • 2hours lock was lost not by instability of VIS, by something but we are not sure.
    • IR flashes could be seen with CARM lock, but it is not sure it was TEM00. We could know FSR of cavity by the measurement.
  • Yarm commissioning
    • Nakano-kun, Eleonora lead the Y arm commissioning task, and Sugimoto-kun can join to Y arm team. Enzo and Type B team can work for commissioning work specially for BS and SR.
  • Laser, PSL, IOO report
    • Characterization for PMC, IMC, FSS started. The results will be summerized to somewhere.
    • ISS noise hunting started. No difference was seen between KIKUSUI and KEPCO DC power supply.

Others

  • Next meeting: 11/27.