* Attendance: Miyakawa, Aso, Kozakai, Lucia, Eleonora, Oshino, Miyokio * Zoom: Suzuki, Nakano, Takahashi, Uchiyama, Ushiba |
* Attendance: Miyakawa, Aso, Enomoto, Izumi, Lucia * Zoom: Kozakai, Yamamoto, Koseyama, Oshino, Suzuki, Yokozawa, Ushiba |
Line 10: | Line 10: |
* CAL injection on 11/26-29 won't affect to commissioning task. |
|
Line 11: | Line 13: |
* Y arm alignment starts after NAB installation on the week of 11/26, with IR laser only. | === Discussion === * We need 2weeks more. * Minimum success is stabilization of IR fluctuation to cavity resonant frequency. |
Line 18: | Line 23: |
* Laser, PSL, IOO report * At least more than 15W can be provided into the IFO! * 20% of loss of 30% can be explained by lossy 4 mirrors. * Report the incident to the Safety office. |
* Yarm commissioning * Nakano-kun, Eleonora lead the Y arm commissioning task, and Sugimoto-kun can join to Y arm team. Enzo and Type B team can work for commissioning work specially for BS and SR. |
Line 24: | Line 27: |
* DGS * Scheduling for maintenance time on Wednesday morning. * DAQ, k1iy1, k1ioo, k1imc0, k1lsc will be stopped. |
* Laser, PSL, IOO report * Characterization for PMC, IMC, FSS started. The results will be summerized to somewhere. * ISS noise hunting started. No difference was seen between KIKUSUI and KEPCO DC power supply. |
Line 30: | Line 34: |
* Next meeting: 11/20. | * Next meeting: 11/27. |
Minute of KAGRA commissioning meeting
- Date: 2018/11/20 11AM~12PM
- Attendance: Miyakawa, Aso, Enomoto, Izumi, Lucia
- Zoom: Kozakai, Yamamoto, Koseyama, Oshino, Suzuki, Yokozawa, Ushiba
Schedule
- CAL injection on 11/26-29 won't affect to commissioning task.
Discussion
- We need 2weeks more.
- Minimum success is stabilization of IR fluctuation to cavity resonant frequency.
- X arm lock
- 2hours lock was lost not by instability of VIS, by something but we are not sure.
- IR flashes could be seen with CARM lock, but it is not sure it was TEM00. We could know FSR of cavity by the measurement.
- Yarm commissioning
- Nakano-kun, Eleonora lead the Y arm commissioning task, and Sugimoto-kun can join to Y arm team. Enzo and Type B team can work for commissioning work specially for BS and SR.
- Laser, PSL, IOO report
- Characterization for PMC, IMC, FSS started. The results will be summerized to somewhere.
- ISS noise hunting started. No difference was seen between KIKUSUI and KEPCO DC power supply.
Others
- Next meeting: 11/27.