⇤ ← Revision 1 as of 2019-02-05 10:39:42
Size: 300
Comment:
|
Size: 637
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Kokeyama, Yamamoto, Oshino, Kozakai, Aso, Nakano * Zoom: Izumi, Yokozawa, Michimura |
* Attendance: Miyakawa, Nagano, Lucia, Nakano, Aso, Akutsu, Miyo, Kozakai, Yokozawa, T.Yamamoto * Zoom: Kokeyama, Oshino, Enomoto, Hirose, Inoue, Miyoki, Kokeyama, Ushiba |
Line 12: | Line 12: |
* | * Hirose-san will come on Thursday, and look at mirror surface or inside chamber. * WAB is located pretty close to mirrors on ITMX and ITMY, so not important but no easy. * SRM beam damp will be designed. It will be installed in summer as the same time as middle baffle. |
Line 16: | Line 19: |
* Next meeting: 1/15. | * Next meeting: 2/12. |
Minute of KAGRA commissioning meeting
- Date: 2019/2/5 11:00AM~12PM
- Attendance: Miyakawa, Nagano, Lucia, Nakano, Aso, Akutsu, Miyo, Kozakai, Yokozawa, T.Yamamoto
- Zoom: Kokeyama, Oshino, Enomoto, Hirose, Inoue, Miyoki, Kokeyama, Ushiba
Schedule
Discussion
- Hirose-san will come on Thursday, and look at mirror surface or inside chamber.
- WAB is located pretty close to mirrors on ITMX and ITMY, so not important but no easy.
- SRM beam damp will be designed. It will be installed in summer as the same time as middle baffle.
Others
- Next meeting: 2/12.