Line 15: | Line 15: |
* ETMY has high power coil driver now. * IOO: |
|
Line 17: | Line 20: |
* Y arm was locked with IR by frequency feedback. * The frequency fluctuation of IR was too much for the mass lock, so IR frequency should be stabilized by X arm. * X arm and Y arm were aligned and resonate at at time. Beam position at ITMY was too high(1-2cm), and beam position at ITMX was too low(~1cm). |
=== Discussion === * |
Line 21: | Line 23: |
=== Discussion === | |
Line 29: | Line 30: |
* Next meeting: 5/14. | * Next meeting: 5/21. |
Minute of KAGRA commissioning meeting
- Date: 2019/5/14 11:00AM~11:40AM
- Attendance: Miyakawa, Yamamoto, Stefan, Nakano, Tomura, Miyo, Stefan, Aso, Kokeyama, Oshino, Inoue
- Zoom: Ushiba, Sawada, Takahashi, Uchiyama
Summary of this week
- Height adsustment: Target is ITMY 6mm upper, ITMX 5mm lower.
- One of the stepping motor did not work. It seems current problem. It will be checked today.
- ITMY adjustment was done. ITMX height changed ~2mm.
- ETMY will be used for mass feed back.
- ETMY has high power coil driver now.
- IOO:
Discussion
- What is the configuration for FPMI?
- Locked Fabry-Perot?
- Engineering run should not fix the configuration to FPMI. Configuration should be flexible. We assume June run as proposed.
Others
- Next meeting: 5/21.