=== Discussion ===
Line 17: Line 19:
 * IOO:


=== Discussion ===
 *

 * What is the configuration for FPMI?
  * Locked Fabry-Perot?
 * Engineering run should not fix the configuration to FPMI. Configuration should be flexible. We assume June run as proposed.
 * Matrix diagonalization for ETMY seems to be much smoother than ITMY. Not sure the reason but ITMY seems to have more coupling.

Minute of KAGRA commissioning meeting


  • Date: 2019/5/14 11:00AM~11:40AM
  • Attendance: Miyakawa, Yamamoto, Stefan, Nakano, Tomura, Miyo, Stefan, Aso, Kokeyama, Oshino, Inoue
  • Zoom: Ushiba, Sawada, Takahashi, Uchiyama


Summary of this week

  • Height adsustment: Target is ITMY 6mm upper, ITMX 5mm lower.
    • One of the stepping motor did not work. It seems current problem. It will be checked today.
    • ITMY adjustment was done. ITMX height changed ~2mm.

Discussion

  • ETMY will be used for mass feed back.
    • ETMY has high power coil driver now.
  • Matrix diagonalization for ETMY seems to be much smoother than ITMY. Not sure the reason but ITMY seems to have more coupling.


Others

  • Next meeting: 5/21.