= Minute of KAGRA commissioning meeting =
----

 * Date: 2019/5/28 15:00~16:00
 * Attendance: Miyakawa, Tomura, Fabian, Oshino, Washima, Yokozawa, Nakano, Terrence, Dahan, Kozakai, Pan, Sawada, Nakano, Yamada
 * Zoom: Miyoki, Takahashi, Eleonora, Inoue, Fujii

-----
=== Summary of last week ===
 * Cryo cooler for Yarm stopped and finesse was recovered.
  * Xarm 1451(1) with ITMX 73 K ETMX 120 K
  * Yarm 1312(5) with ITMY 65 K ETMY 75 K
 * Cryo status and plan
  * ETMs has no dew on 80K viewport but ITMs has still dew on their viewport.


=== Discussion ===
 * Results of finesse measurement looks a bit too high. Needs estimation of loss inside cavity for Yarm.
 * We should keep finesse measurement for going back the cooling down ITMY.

 * For DRMI preparations, optics, circuit, cabling, control models are almost ready.
  * Type A control test should be done during DRMI.
  * Type B and A needs some IFO as sensor.
 
 * Write manual if you experienced something.

 * CAL: MICH and DRMI calibration model is ready.

 * Remote work should be managed by calling to control room or sending email to gokagra.

 * Smooth transition for when watch dog is engaged has been implemented to Type B. It should be implemented to Type A.
  * When? -> Maybe tomorrow morning during maintenance time or the next week during DRMI.

 * Engineering run:
  * IMC is the first candidate which will be used for run. This is because Guardian is ready for only IMC, not for Michelson or X arm.


----
== Others ==
 
 * Next meeting: 5/28.