⇤ ← Revision 1 as of 2019-06-25 11:53:05
Size: 1454
Comment:
|
← Revision 2 as of 2019-06-25 12:01:00 ⇥
Size: 800
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* Results of finesse measurement looks a bit too high. Needs estimation of loss inside cavity for Yarm. * We should keep finesse measurement for going back the cooling down ITMY. * For DRMI preparations, optics, circuit, cabling, control models are almost ready. * Type A control test should be done during DRMI. * Type B and A needs some IFO as sensor. * Write manual if you experienced something. * CAL: MICH and DRMI calibration model is ready. * Remote work should be managed by calling to control room or sending email to gokagra. * Smooth transition for when watch dog is engaged has been implemented to Type B. It should be implemented to Type A. * When? -> Maybe tomorrow morning during maintenance time or the next week during DRMI. * Engineering run: * IMC is the first candidate which will be used for run. This is because Guardian is ready for only IMC, not for Michelson or X arm. |
* Needs check the gate valve were really open. * Location of spare mirror are not sure. At lease one GTAT mirror exists at Kashiwa campus, but we should have 6 spares. * Still we are not sore that we should have Erun on 7/13. It depends on schedule of opening chamber strongly. |
Line 37: | Line 21: |
* Next meeting: 5/28. | * Next meeting: 7/2. |
Minute of KAGRA commissioning meeting
- Date: 2019/6/25 11:00~12:00
- Attendance: Miyakawa, Nakano, Ushiba, Miyo, Enomoto, Kozakai, Fabian, Ogaki, Matin, Yokozawa, Yamato, Darkhan, Oshino
- Zoom: Mio, Eleonora, Sawada, Takahashi, Okutomi, Ohashi, Yamada, Izumi, Miyoki
Summary of last week
see the file at JGW-G1910372
Discussion
- Needs check the gate valve were really open.
- Location of spare mirror are not sure. At lease one GTAT mirror exists at Kashiwa campus, but we should have 6 spares.
- Still we are not sore that we should have Erun on 7/13. It depends on schedule of opening chamber strongly.
Others
- Next meeting: 7/2.