Minute of KAGRA commissioning meeting
- Date: 2019/7/2 11:00~12:00
- Attendance: Miyakawa, Koseyama, Aso, Nakano, Kozakai, Fabian, Miyoki, Takahashi, Akutsu, Inoue, Miyo, Washima, Ogaki, T. Yamamoto
- Zoom: Hiro Yamamoto, Ohashi, Uchiyama, Eleonora, Mio, Ushiba
Summary of last week
- ETMY misalignment was fixed.
- Investigation of polarization is going on.
- We keep central area for a while and keep DRMI characterization specially for control.
- We confirmed that we would have an engineering run on 7/13.
Discussion
- 12pm-6pm
- PEM needs ~10min after run.
- CAL needs free swinging Michelson.
- Michelson
- Action items for this month
- Investigation for shape of reflection of both ITEX and ITMY.
- P-pol shape with PRMI lock.
- Rotating polarization of geen.
- Control signal for PRMI/DRMI with polarization.
- Education for DRMI from specialty.
- Y arm lock with mass lock.
- FPMI lock.
- noise hunting.
- Dampin test mass.
- OMC commissioning.
- Investigation for shape of reflection of both ITEX and ITMY.
Others
- Next meeting: 7/2.