Differences between revisions 2 and 12 (spanning 10 versions)
Revision 2 as of 2019-07-23 11:00:07
Size: 303
Comment:
Revision 12 as of 2019-07-23 11:51:02
Size: 812
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa, Aso, Washima, Yamamoto, Yokozawa, Enomoto, Yamada, Stefan, Ogaki
 * Zoom: Takahashi, Shoda, Uchiyama, Miyoki
 * Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
 * Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi, Sawada, Inoue
Line 11: Line 11:
 * ==== Hando off ====
 * Hand off from ALS to IR next.
  * Needs transmitted light.
   * CARM to be square root of transmitted light during hand off.
  * Normalized CARM and DARM in digital should be used.
 * ASC is being used. Needs replacement of RT-PC
 * PRMI was locked with 3f.
 * Mode hoping exists but less now if without SRM.

==== Fiber noise cancellation ====
  * Installation will be this weekend in the earliest case.
 

Minute of KAGRA commissioning meeting


  • Date: 2019/7/23 11:00~12:00
  • Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
  • Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi, Sawada, Inoue


Discussion

Hando off

  • Hand off from ALS to IR next.
    • Needs transmitted light.
      • CARM to be square root of transmitted light during hand off.
    • Normalized CARM and DARM in digital should be used.
  • ASC is being used. Needs replacement of RT-PC
  • PRMI was locked with 3f.
  • Mode hoping exists but less now if without SRM.

Fiber noise cancellation

  • Installation will be this weekend in the earliest case.


Others

  • Next meeting: 7/30.