303
Comment:
|
628
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Aso, Washima, Yamamoto, Yokozawa, Enomoto, Yamada, Stefan, Ogaki * Zoom: Takahashi, Shoda, Uchiyama, Miyoki |
* Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan * Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi |
Line 11: | Line 11: |
* | * Hand off from ALS to IR next. * Needs transmitted light. * CARM to be square root of transmitted light during hand off. * Normalized CARM and DARM in digital should be used. * PRMI was locked with 3f. * Mode hoping exists but less now if without SRM. |
Minute of KAGRA commissioning meeting
- Date: 2019/7/23 11:00~12:00
- Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
- Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi
Discussion
- Hand off from ALS to IR next.
- Needs transmitted light.
- CARM to be square root of transmitted light during hand off.
- Normalized CARM and DARM in digital should be used.
- Needs transmitted light.
- PRMI was locked with 3f.
- Mode hoping exists but less now if without SRM.
Others
- Next meeting: 7/30.