Differences between revisions 5 and 6
Revision 5 as of 2019-07-23 11:12:36
Size: 499
Comment:
Revision 6 as of 2019-07-23 11:20:49
Size: 611
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
  * Needs transmitted light   * Needs transmitted light.
   * CARM to be transmitted light during hand off.
  * Normalized CARM and DARM in digital should be used.
Line 15: Line 17:

Minute of KAGRA commissioning meeting


  • Date: 2019/7/23 11:00~12:00
  • Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
  • Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi


Discussion

  • Hand off from ALS to IR next.
    • Needs transmitted light.
      • CARM to be transmitted light during hand off.
    • Normalized CARM and DARM in digital should be used.
  • PRMI was locked with 3f.
  • Mode hoping exists but less now if without SRM.


Others

  • Next meeting: 7/30.

KAGRA/Commissioning/Weekly/20190723/Minute (last edited 2019-07-23 11:51:02 by OsamuMiyakawa)