Size: 770
Comment:
|
← Revision 6 as of 2019-08-06 13:47:41 ⇥
Size: 802
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Miyoki, Aso, Nakano, Kozakai, Yokoyama, Ito, Sekiguti, Kume, Yokozawa | * Attendance: Miyakawa, Miyoki, Aso, Nakano, Kozakai, Yokoyama, Ito, Sekiguti, Kume, Yokozawa, Oshino, Fabian, Okutomi, Sugimoto, Enomoto |
Line 7: | Line 7: |
* Zoom: Uchiyama, Yamamoto, Kokeyama, Shoda, Sawada, Hiro, Yamada | * Zoom: Uchiyama, Yamamoto, Kokeyama, Shoda, Sawada, Hiro, Yamada, Inoue, Izumi, Akutsu, Ushiba |
Line 12: | Line 12: |
==== Hando off ==== * Hand off from ALS to IR next. * Needs transmitted light. * CARM to be square root of transmitted light during hand off. * Normalized CARM and DARM in digital should be used. * ASC is being used. Needs replacement of RT-PC * PRMI was locked with 3f. * Mode hoping exists but less now if without SRM. |
|
Line 21: | Line 13: |
==== Fiber noise cancellation ==== * Installation will be this weekend in the earliest case. |
* Commissioning work with PEM and DET people as a member of commissioning work. * Noise information should be told to PEM, DET. * EX: long standing noise issue like IOO 60Hz noise. * 1PM is a good chance to propose issues. * Needs some "daily" long locking data. * Stay lock during night after commissioning work was done in the day. * Needs an easy way to find tools for DET etc. |
Line 28: | Line 24: |
* Next meeting: 7/30. | * Next meeting: 8/20. |
Minute of KAGRA commissioning meeting
- Date: 2019/8/6 11:00~12:00
- Attendance: Miyakawa, Miyoki, Aso, Nakano, Kozakai, Yokoyama, Ito, Sekiguti, Kume, Yokozawa, Oshino, Fabian, Okutomi, Sugimoto, Enomoto
- Zoom: Uchiyama, Yamamoto, Kokeyama, Shoda, Sawada, Hiro, Yamada, Inoue, Izumi, Akutsu, Ushiba
Discussion
- Commissioning work with PEM and DET people as a member of commissioning work.
- Noise information should be told to PEM, DET.
- EX: long standing noise issue like IOO 60Hz noise.
- 1PM is a good chance to propose issues.
- Needs some "daily" long locking data.
- Stay lock during night after commissioning work was done in the day.
- Needs an easy way to find tools for DET etc.
Others
- Next meeting: 8/20.