Size: 686
Comment:
|
← Revision 3 as of 2019-08-20 14:02:43 ⇥
Size: 721
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, Aso, Kozakai, Yokozawa, Oshino, Washimi, Kokeyama, Ushiba | * Attendance: Miyakawa, Aso, Kozakai, Yokozawa, Oshino, Washimi, Kokeyama, Ushiba, Nakano |
Line 12: | Line 12: |
* Commissioning work with PEM and DET people as a member of commissioning work. * Noise information should be told to PEM, DET. * EX: long standing noise issue like IOO 60Hz noise. * 1PM is a good chance to propose issues. * Needs some "daily" long locking data. * Stay lock during night after commissioning work was done in the day. * Needs an easy way to find tools for DET etc. |
* We agreed to make a decision which FPMI or DRFPMI we should go, at the end of September. * We need many informations, of course experimental results, and some simulation results as mode matching compensation if no PRM, and sensitivity estimation of FPMI with current ITMs. * Schedule for both FPMI and DRFPMI should be shown before decision making at the end of September. |
Line 24: | Line 19: |
* Next meeting: 8/20. | * Next meeting: 8/27 for brain storming for VIS and cryopayload. |
Minute of KAGRA commissioning meeting
- Date: 2019/8/20 11:00~12:00
- Attendance: Miyakawa, Aso, Kozakai, Yokozawa, Oshino, Washimi, Kokeyama, Ushiba, Nakano
- Zoom: Miyoki, Shoda, Hiro, Izumi
Discussion
- We agreed to make a decision which FPMI or DRFPMI we should go, at the end of September.
- We need many informations, of course experimental results, and some simulation results as mode matching compensation if no PRM, and sensitivity estimation of FPMI with current ITMs.
- Schedule for both FPMI and DRFPMI should be shown before decision making at the end of September.
Others
- Next meeting: 8/27 for brain storming for VIS and cryopayload.