Line 11: | Line 11: |
2017/4/10 updated {{attachment:KAGRA/Commissioning/Commissioning_schedule_20180410.png||width=1200}} |
2017/4/17 updated {{attachment:KAGRA/Commissioning/Commissioning_schedule_20180417.png||width=1200}} |
Line 24: | Line 24: |
* Laser, Ref''''''Cav, IMC: 苔山、中野 * IMMT: 大石 * VIS * Type Bp: 正田、三代 * Type B: Mark * Type A: 奥富、宮本 * Pico''''''Motor: 三代 * Digital: 山本、宮川 * 回路: 上泉、霜出 * DC電源関連: 宮川 * AC電源関連: 粟井 * 水漏れなど: 古田、早河 |
|
Line 50: | Line 39: |
=== 2018/4/17(Tue.) === | === 2018/4/28(Sat.) === |
Line 53: | Line 42: |
* 1st day of Phase 1 operation * OLG by |
|
Line 55: | Line 46: |
* VAC: *Kimura * Large leak was found but it is not identified where it is. Currently Vacuum level is 200Pa, but it should be around 0.1Pa if no leaks. |
|
Line 58: | Line 47: |
* ETMX: *Hasegawa * Damping for yaw woks somehow and RMS is ~0.2urad. * A very high Q peak was found on pitch and it takes several hours to be calm. This high Q seems to be Sphere parts. * ETMY: :Miyamoto, Shishido * No progress for damping. * ETMY: *Okutomi * ETMY TF was measured. Not only 2 but all F1, F2, F3 seem to be locked. Moving FR may fix the lock. * DGS: *Yamamoto * IO chassis of k1ioo was disconnected somehow. |
* IFO: *Izumi, Enomoto + many * ETMY damping filter was back to what was best. Fluctuation is ~1urad. * ETMX damping filter changed a bit. Fluctuation is < 1urad. * BS alignment noise was improved around 10-30Hz 8 at most. * Gain bump can be seen around UGF of MICH. * Lock of the last night was ~1hour. Lock was lost because of L to oplev coupling seems to exist. |
Line 70: | Line 55: |
* Camera: Yokozawa, Inoue * IYA camera could not see BS, because some clipping may exist. |
|
Line 71: | Line 58: |
* WAB: Akutsu * Heater off. * IYC: Tomaru * Cooler off. * Operaton: * [[KAGRA/Commissioning/Phase1/Operation|Operation wiki page]] is opened. |
|
Line 74: | Line 69: |
* IFO: Enomoto, Nakano * Damping, BS L2P, restoring alignment. |
* CAL: Yamamoto * Optical gain measurement * Open loot TF. * Amplitude tuning for injection. * Sensitivity. * BS to MICH TF, if can. |
Line 77: | Line 76: |
* VAC: *Kimura * Identifies the location of leak. * VAC: *Inoue * Vacuum gage for wide area will be installed. |
* IFO: *Izumi, Enomoto + many * Higher BS oplev gain will be tried today by the gain switch on opec board or the gain setting on whitening board. |
Line 99: | Line 95: |
* week of 4/16 | * week of 4/23 |
Line 101: | Line 97: |
* Leak check. * Opening the last gate valve. |
* 4/28 Operation start |
Line 104: | Line 99: |
* week of 4/23 * Operation |
* week of 4/30 * Operation continues. |
Line 109: | Line 104: |
* Large leak was found but it is not identified where it is. * IO chassis of k1ioo was disconnected somehow. * A very high Q peak was found on pitch and it takes several hours to be calm. This high Q seems to be Sphere parts. * ETMY TF was measured. Not only 2 but all F1, F2, F3 seem to be locked. Moving FR may fix the lock. |
|
Line 125: | Line 116: |
||27||2018/4/17||[[KAGRA/Commissioning/Weekly/20180417/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180417.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180417/Minute|Minute]]|| || |
KAGRA Commissioning Wiki
Task list
Schedule
2017/4/17 updated
Working people assignment
- *: responsible person
Meetings
Morning meeting
- Date and time: Every weekday, 9AM
- Location: Control room, or eZuce
2018/4/28(Sat.)
* Remote participants by eZuce: None * 1st day of Phase 1 operation
- OLG by
Report of work (*:responsible person)
- IFO: *Izumi, Enomoto + many
- ETMY damping filter was back to what was best. Fluctuation is ~1urad.
ETMX damping filter changed a bit. Fluctuation is < 1urad.
- BS alignment noise was improved around 10-30Hz 8 at most.
- Gain bump can be seen around UGF of MICH.
- Lock of the last night was ~1hour. Lock was lost because of L to oplev coupling seems to exist.
- Camera: Yokozawa, Inoue
- IYA camera could not see BS, because some clipping may exist.
- WAB: Akutsu
- Heater off.
- IYC: Tomaru
- Cooler off.
- Operaton:
Operation wiki page is opened.
Work plan (*:responsible person)
- CAL: Yamamoto
- Optical gain measurement
- Open loot TF.
- Amplitude tuning for injection.
- Sensitivity.
- BS to MICH TF, if can.
- IFO: *Izumi, Enomoto + many
- Higher BS oplev gain will be tried today by the gain switch on opec board or the gain setting on whitening board.
Laser hazard
- [AM]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
- [PM]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
- [night]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
Weekly
- week of 4/23
- Michelson control.
- 4/28 Operation start
- week of 4/30
- Operation continues.
Issues
KAGRA/Commissioning/DailyWork << < 2024 / 10 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
Meeting for pump down test at ETMX 2 (Minute, Check list)
Meeting for pump down test at ETMX 1 (Minute, Check list)
Meeting for pump down test at Center are (Minute, Check list)
Meeting for pump down and cooling at ETMY3 (Minute, Check list)
Meeting for pump down and cooling at ETMY2 (Minute, Check list)
Meeting for pump down and cooling at ETMY1 (Minute, Check list)
Meeting for closing ETY (Minute)
Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools