16615
Comment:
|
16687
|
Deletions are marked like this. | Additions are marked like this. |
Line 47: | Line 47: |
=== 2018/11/29(Thur.) === | === 2018/11/30(Thur.) === |
Line 51: | Line 51: |
* Control room: Kokeyama, Fukunaga, Lucia, Kitazawa, Nakano * Fan hut: Yamamoto, Oshino, Ushiba, Enomoto, Yokogawa, Sugimoto, Akutsu * Zoom: Miyakawa |
* Control room: Miyakawa, Nakano, Lucia, Kozakai, Kohan, Fukunaga * Fan hut: Enomoto, Kokeyama, Miyazaki * Zoom: |
Line 68: | Line 68: |
* MIF: Enomoto, Miyoki, Sugimoto, Yokogawa, Nakano, Miyazaki | * MIF: Enomoto, Sugimoto, Yokogawa, Nakano, Miyazaki, Aso * CAL: Kozakai, Kohan |
Line 72: | Line 73: |
* Enomoto, Yamamoto | * Sat. Sun: Enomoto, Yamamoto, Nakano, Miyazaki, Yokozawa(only Sat.) |
Line 75: | Line 77: |
* Testing for ITMX. * monit was disabled on all RTPC. * Monit checked every 10sec, but we saw DAQ failure every 1sec or something. This is something strange. |
* Coil driver need remote rest switch for trip. |
Line 82: | Line 84: |
* Tighten fiber for green. * Measuring beam profile for ASC for MC was done this morning. * Adding second rack on ETMY. |
|
Line 84: | Line 89: |
* Checking fiber on POP and PSL table. * Modification wind shield. |
|
Line 87: | Line 90: |
* Looking at IR signal with tighten fiber. * CAL will work Y end for Periscope alignment. |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Meetings
Daily Meetings (1PM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 1PM
- ~10min, as short as possible
- Location: Control room and Fan hut connected by eZuce
2018/11/30(Thur.)
Attendance
- Control room: Miyakawa, Nakano, Lucia, Kozakai, Kohan, Fukunaga
- Fan hut: Enomoto, Kokeyama, Miyazaki
- Zoom:
Laser hazard
|
Before 3PM |
After 3PM |
|
|
|
|
|
Center |
PSL |
IR & Green |
IR & Green |
Center |
around PR2 |
IR & Green |
IR & Green |
Center |
behinde SR2&Yfront |
IR |
IR |
X end 1F |
IR & Green |
IR & Green |
|
Y end 1F |
N/A |
N/A |
Night workers in the mine
- MIF: Enomoto, Sugimoto, Yokogawa, Nakano, Miyazaki, Aso
- CAL: Kozakai, Kohan
Weekend
- Sat. Sun: Enomoto, Yamamoto, Nakano, Miyazaki, Yokozawa(only Sat.)
Transition from morning work (*:responsible person)
- Coil driver need remote rest switch for trip.
Report of work (*:responsible person)
- Fixing fiber cable for green.
- Tighten fiber for green.
- Measuring beam profile for ASC for MC was done this morning.
- Adding second rack on ETMY.
Work plan (*:responsible person)
- Looking at IR signal with tighten fiber.
- CAL will work Y end for Periscope alignment.
KAGRA/Commissioning/DailyWork << < 2024 / 9 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools