16722
Comment:
|
18706
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
== Readiness for the X arm commissioning == * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]] |
|
Line 33: | Line 37: |
==== Daily Meetings (1PM) ==== | ==== Daily Meetings (9AM) ==== |
Line 43: | Line 47: |
* Date and time: Every weekday, 1PM * ~10min, as short as possible |
* Date and time: Every weekday, 9AM * First ~10min in the morning meeting, as short as possible |
Line 47: | Line 51: |
=== 2018/12/11(Mon.) === ==== Attendance ==== * Control room: Miyakawa, Izumi, Enomoto, Oshino, Yokozawa, Kozum Guego, Fabian, Lucia, Eleonora, Enzo * Fan hut: * Zoom: Aso, Kozakai ==== Laser hazard ==== |||| ||Before 3PM||After 3PM || |||| || || || ||Center||PSL ||IR & Green||IR & Green|| ||Center||around PR2 ||N/A ||IR & Green|| ||Center||behinde SR2&Yfront||N/A ||IR || ||||X end 1F ||N/A ||IR & Green|| ||||Y end 1F ||IR ||IR || ==== Night workers in the mine ==== * MIF: Enomoto, Izumi, Haino |
=== 2019/1/23(Wed.) === |
Line 72: | Line 56: |
==== Transition from morning work (*:responsible person) ==== * Schedule * Current status as of 1/22: IR and Green reached X end PD. * 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31. * 1/22 or 23 Surface inspection for SR mirrors. * 1/23-25 Cleaning HR of SR2. * 1/23 BS will be aligned to Y-end PD by IR. * 1/24-25 ITMX will be aligned to REFL by IR. * 1/24-25 ITMY will be aligned to REFL by IR. * 1/26 Beam position of IR at SR3 will be confirmed how far from the center. * 1/28-29 SR3 will be aligned to SR2 center by IR. * 1/30 Green beam will be injected from SR2 AR surface to Y end PD. * 1/31-2/1 Removing bellows at PR and SR area. * 1/31-2/1 Cleaning HR of PR3 and AR of SR2 * 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR * 2/4-8 Alignment of ETMY -> POS by Green * 2/12-15 Closing door for central area, pumping down * needs drift monitor for VIS ==== Report of work (*:responsible person) ==== |
|
Line 73: | Line 85: |
==== Transition from morning work (*:responsible person) ==== * P cal at EY will be the next month. * Micro seismic 0.2-0.3Hz by payload is noisy. Needs inertial damping. ==== Report of work (*:responsible person) ==== |
* BS: Two cables were not connected well, so actuation was not correct when measuring TF day before yesterday. * TF was measured yesterday but still TF showed something different from the last correct measurement. * FR moved 800um. * Anyway alignment can be proceeded probably this afternoon. * CRY: we found disconnected cables at ITMX. * OMC: OMMT was aligned, and it was found that OSEM was touched somewhere. * PEM: Ondotori is still not working because of software issue. |
Line 85: | Line 97: |
* COMM: we will check PR3 first, then SR3. * Access to PR3 is quite difficult, gate valve needs to be removed or optical table needs to be fix. * we will decide whether we need clean the mirror surface or not. * Once mirror inspection and cleaning (if necessary), then will start alignment for REFL using reflected beam from ITMX. * COMM: PDA will be placed EYA. * SR3, SR2: height is OK. FR will be tuned. * SR3 surface will be inspected. |
|
Line 98: | Line 119: |
||59||2019/1/29||[[KAGRA/Commissioning/Weekly/20190129/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190129/Minute|Minute]]|| || ||58||2019/1/22||[[KAGRA/Commissioning/Weekly/20190122/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190122/Minute|Minute]]|| || ||57||2019/1/8||[[KAGRA/Commissioning/Weekly/20190108/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190108/Minute|Minute]]|| || ||56||2018/12/25||[[KAGRA/Commissioning/Weekly/20181225/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181225/Minute|Minute]]|| || ||55||2018/12/17||[[KAGRA/Commissioning/Weekly/20181217/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181217/Minute|Minute]]|| || |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/1/23(Wed.)
Weekend
Transition from morning work (*:responsible person)
- Schedule
- Current status as of 1/22: IR and Green reached X end PD.
- 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.
- 1/22 or 23 Surface inspection for SR mirrors.
- 1/23-25 Cleaning HR of SR2.
- 1/23 BS will be aligned to Y-end PD by IR.
- 1/24-25 ITMX will be aligned to REFL by IR.
- 1/24-25 ITMY will be aligned to REFL by IR.
- 1/26 Beam position of IR at SR3 will be confirmed how far from the center.
- 1/28-29 SR3 will be aligned to SR2 center by IR.
- 1/30 Green beam will be injected from SR2 AR surface to Y end PD.
- 1/31-2/1 Removing bellows at PR and SR area.
- 1/31-2/1 Cleaning HR of PR3 and AR of SR2
2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
2/4-8 Alignment of ETMY -> POS by Green
- 2/12-15 Closing door for central area, pumping down
- needs drift monitor for VIS
Report of work (*:responsible person)
- BS: Two cables were not connected well, so actuation was not correct when measuring TF day before yesterday.
- TF was measured yesterday but still TF showed something different from the last correct measurement.
- FR moved 800um.
- Anyway alignment can be proceeded probably this afternoon.
- CRY: we found disconnected cables at ITMX.
- OMC: OMMT was aligned, and it was found that OSEM was touched somewhere.
- PEM: Ondotori is still not working because of software issue.
Work plan (*:responsible person)
- COMM: we will check PR3 first, then SR3.
- Access to PR3 is quite difficult, gate valve needs to be removed or optical table needs to be fix.
- we will decide whether we need clean the mirror surface or not.
- Once mirror inspection and cleaning (if necessary), then will start alignment for REFL using reflected beam from ITMX.
- COMM: PDA will be placed EYA.
- SR3, SR2: height is OK. FR will be tuned.
- SR3 surface will be inspected.
KAGRA/Commissioning/DailyWork << < 2024 / 9 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools