Line 51: Line 51:
=== 2019/1/16(Wed.) === === 2019/1/17(Thur.) ===
Line 54: Line 54:
 * Some work for Y arm alignment.  * Nakano, Enomoto: Some work for Y arm alignment.
Line 62: Line 62:
 * IOO, VAC: Pumping for MC failed yesterday. TP will start today.
  * MC alignment can be started from this morning.
 * IOO: MC was recovered. Finesse was almost the same as before or slightly.
 * VIS: PR2 was almost recovered.
 * BS is almost ready.
 * AOS: WAB is being installed, needs alignment or something today.
 * SR: Measured SR hight was a bit lower than expected.
Line 65: Line 68:
 * CAL: Debugging ETMX Cal. Reached expected sensitivity. 60dB improvement was seen.
  * Whitening for ETMY was installed yesterday and will be checked today.

 * VIS: ITMY and BS TF are being measured yesterday and today.
  * PR2 will be checked and tuned today.

 * VIS: BS fishing rod is being fixed.
 * CAL: Y end PCal noise was improved drastically by 130dB as the same way of X end. We needs some small modifications for model or something.
 * DGS: Maintenance for RFM did not succeed to connect all center and both two ends. Needs investigation today.
 * DGS: X end rack maintenance will finish this Friday or beginning of next week.
 * VAC: Aluminum foil was removed at Y front. Only simple cover is placed to SR direction.
Line 76: Line 75:
 * COM: Fiber noise measurement. Preparation of electronics for Y arm.
 * AOS: Installation of WAB will start ETMX today.
 * COMM: Alignment will start this afternoon from FI. We need some iteration of alignment and adjustment of OSEM etc. for PRs and BS.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/17(Thur.)

Weekend

  • Nakano, Enomoto: Some work for Y arm alignment.

Transition from morning work (*:responsible person)

  • We have maintenance today.

Report of work (*:responsible person)

  • IOO: MC was recovered. Finesse was almost the same as before or slightly.
  • VIS: PR2 was almost recovered.
  • BS is almost ready.
  • AOS: WAB is being installed, needs alignment or something today.
  • SR: Measured SR hight was a bit lower than expected.
  • CAL: Y end PCal noise was improved drastically by 130dB as the same way of X end. We needs some small modifications for model or something.
  • DGS: Maintenance for RFM did not succeed to connect all center and both two ends. Needs investigation today.
  • DGS: X end rack maintenance will finish this Friday or beginning of next week.
  • VAC: Aluminum foil was removed at Y front. Only simple cover is placed to SR direction.

Work plan (*:responsible person)

  • COMM: Alignment will start this afternoon from FI. We need some iteration of alignment and adjustment of OSEM etc. for PRs and BS.

KAGRA/Commissioning/DailyWork
<< <  2024 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)