Differences between revisions 656 and 662 (spanning 6 versions)
Revision 656 as of 2019-03-14 09:16:38
Size: 20390
Comment:
Revision 662 as of 2019-03-20 09:10:09
Size: 20123
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/3/14(Thur.) === === 2019/3/20(Wed.) ===
Line 59: Line 59:
   * 3/4-14 PRM: Misalignment does not reach where beam hits damper.    * --(3/4-14 PRM: Misalignment does not reach where beam hits damper.)--
Line 63: Line 63:
   * --(3/15: some SRs work)--
Line 65: Line 66:
  * 3/18-19: Re-alignment
  * 3/19: Closing
  * 3/20: pump down

 * Yend
  * --(3/18: Re-alignment)--
  * 3/19-21: Closing
  * 3/22: pump down

 * ITMX:
  * 3/19: Cooling stop
  * 3/28: Opning chamber
  * 3/28: Fixing thermal touch
  * 3/29: closing chamber and start pumping down.
  * 4/1: Start cooling.

 * Xend
Line 75: Line 83:
   * --(3/7,8: leak test)--   * 3/21: leak test
  * 3/27: cooling start
Line 87: Line 96:
  * --(3/11~3/12: ETMX tuning.)--   * --(3/11~3/15: ETMX tuning.)--
Line 91: Line 100:
  * 3/21 closing
  * 3/22 Pumping down
   * Leak test
  * 3/23-24: Pcal alignment
  * 3/25:
closing
  * 3/26: Pumping down
  * 4/2-4: Leak test
  * 3/27: Cooling start
Line 110: Line 121:
 
Line 111: Line 123:
 * Type B: SR2: We found ghost beam of oplev for SR2, and we need several works to fix it and others.
 * Type Bp: PRM: We found nothing was touching except for cable, and we found loosen screws. We will fix them today.
 * Type A: ETMX will be fixed for
 * MIF: Green laser was swapped. We noticed that the AC power was low, and that is the cause of mulfunction.
  * Beat note is somehow low.
  * OMC rack is being implemented specially for circuits.
  * Green light injection for SR2 table by changing laser source will be done today. Aluminum foil will be put at SR2 table.

 * CRY: Temperature of BF of ITMX was fixed and shows correct one. ITMY was connected but still show some fake one.
  * Touching around Cryopayload will be checked today.
 * COM: Alignment was done by the night of day before yesterday.
 * Type A:
  * ETMX has been confirmed that it is healthy.
  * ETMY: IP was something wrong and still alignment was not finished day before yesterday.
   * Motor had some problem, and it will be fixed.
 * Type B: SR2 oplev is being tuned in these days.
Line 126: Line 133:
 * Green light injection for SR2 table by changing laser source will be done today. Aluminum foil will be put at SR2 table.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/3/20(Wed.)

Schedule

  • Center
    • 2/26-27: Venting

    • 2/28-3/15: Health check and maintenance for VIS
      • PRM: One flag was dropped. -> leave it

      • 3/4-14 PRM: Misalignment does not reach where beam hits damper.

      • 3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.

      • 3/15: BS: Yaw offset adjustment by hand. -> 3/5-6

        • 3/12: BS ok

      • 3/15: some SRs work

    • 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.

    • 3/18: Re-alignment

    • 3/19-21: Closing
    • 3/22: pump down
  • ITMX:
    • 3/19: Cooling stop
    • 3/28: Opning chamber
    • 3/28: Fixing thermal touch
    • 3/29: closing chamber and start pumping down.
    • 4/1: Start cooling.
  • Xend
    • 1/25-2/20: Yend Pcal finalization

    • 3/5: EYA remaining works by Enomoto, Inoue.

    • 2/25-3/5: Yend WAB finalization

    • 3/6: Y end closing (no laser hazard at least in the morning)

    • 3/7: Y end pump down

    • 3/21: leak test
    • 3/27: cooling start
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

      • 2/27: ETMX release

    • 2/23-3/6: Xend Pcal finalization 1

      • Periscope installation

      • 3/6: Beam position by IR and Green

    • 3/5 AOS: EY and EX(if they have time) work.

    • 3/6: Green X alignment (no IR), and no hazard at Y end.

    • 3/11, 18,19: Xend WAB finalization.
    • 3/11~3/15: ETMX tuning.

    • 3/19: Heatlink etc.
    • 3/19: ETMX finalization by Takahashi
    • 3/18,19: ETMX alignement
    • 3/23-24: Pcal alignment
    • 3/25: closing
    • 3/26: Pumping down
    • 4/2-4: Leak test
    • 3/27: Cooling start
  • 3/18~ : Night work starts, daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • 2/18-2/22: PRMI commissioning
  • 3/25~?: DRMI commissioning
  • 3/25-4/19: Y arm commissioning
  • 3/25-4/19: FPMI commissioning

Note

  • Night work does not start from 3/11 due to the 2weeks delay by VIS troubles.
    • It does not mean that night work is prohibited but it means that officially night shift responsible person won't be assigned and we have no daily meeting at 1pm.
    • Official night work starts 3/18 or 3/25, but not determined yet.

Weekend

Report of work

  • COM: Alignment was done by the night of day before yesterday.
  • Type A:
    • ETMX has been confirmed that it is healthy.
    • ETMY: IP was something wrong and still alignment was not finished day before yesterday.
      • Motor had some problem, and it will be fixed.
  • Type B: SR2 oplev is being tuned in these days.

Work plan

KAGRA/Commissioning/DailyWork
<< <  2024 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)