Line 52: | Line 52: |
=== 2019/4/25(Thur.) === | === 2019/5/14(Tue.) === |
Line 55: | Line 55: |
* 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, ) * 5/20-24: Exchanging cryo valves. |
|
Line 56: | Line 59: |
* --(3/25: Venting)-- * --(3/27-4/9: Fixing PR2 or others)-- * --(4/4 -4/5: Gluing)-- * --(4/8: alignment check)-- * --(4/8-10: OSEM adjustment)-- * --(4/10: alignment check)-- * --(4/11: VIS final health check)-- * --(4/11-12: Closing)-- |
|
Line 65: | Line 60: |
* 4/29,30: Leak check | * --(4/29,30: Leak check)-- * --(~5/3: Vent and pumpdown)-- * --(5/9: leak check)-- |
Line 68: | Line 65: |
* --(3/19: Cooling stop)-- * --(3/25: Venting start)-- * --(3/27: Opning chamber)-- * --(3/27~: Fixing thermal touch)-- * --(4/2~: closing chamber and start pumping down)-- |
* --(4/2~: closing chamber and start pumping down.)-- |
Line 74: | Line 67: |
* --(5/8: Cooling done)-- | |
Line 76: | Line 70: |
* --(3/25: closing and pump down)-- * --(4/8: Leak check)-- * --(4/9-10: venting)-- * --(4/11: Exchange a broken LED for Photo sensor)-- * --(4/12: closing chamber and start pumping down)-- * --(4/22: Leak check)-- * --(4/22: vent)-- * --(4/24: fix oplev mirror)-- |
|
Line 85: | Line 71: |
* 5/2: leak check * 5/2: Cooling start |
* --(5/2: leak check)-- * --(5/2: Cooling start)-- |
Line 89: | Line 75: |
* --(3/26: Venting start)-- * --(3/28~: Fixing short inside chamber)-- * --(4/3: Fixing F0 actuator)-- |
|
Line 94: | Line 77: |
* --(5/8: Cooling done)-- | |
Line 96: | Line 80: |
* End of April~: DRMI commissioning | |
Line 101: | Line 84: |
* | * |
Line 104: | Line 87: |
* Y arm commissioning, from the control room. | |
Line 107: | Line 89: |
* Big holiday will start tomorrow. * CAL: 4/27 Yokozawa, Washimi in the mine. * Other work specially IFO work remotely from the control room: |
|
Line 112: | Line 91: |
* VAC: pumping down at ETMX started. -> monitor: Okutomi | * Height adsustment: Target is ITMY 6mm upper, ITMX 5mm lower. * One of the stepping motor did not work. It will be checked today. * ITMY adjustment was done. ITMX height changed ~2mm. * ETMY cables to coil was checked. It was found that One of the pair was flipped, and they were swapped. * COM: After hight adjustment, IFO will be aligned again. Some lock acquisition will be tried again. |
Line 115: | Line 100: |
* Type B: continuously improving Gardian code. | * DGS: Maintenance will be planned for adding cards to k1omc. -> go to the safe mode for all the dolphin connected VIS. * In the next week, several other PCs(LSC, ASC, ALS) will have more cards. |
Line 129: | Line 116: |
||70||2019/5/7||[[KAGRA/Commissioning/Weekly/20190514/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190514/Minute|Minute]]|||| ||69||2019/5/7||[[KAGRA/Commissioning/Weekly/20190507/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190507/Minute|Minute]]|||| |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM, 1PM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/5/14(Tue.)
Schedule
5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )
- 5/20-24: Exchanging cryo valves.
- Center
4/12: Pump down
4/29,30: Leak check
~5/3: Vent and pumpdown
5/9: leak check
- ITMX:
4/2~: closing chamber and start pumping down.
4/10: Cooling starts.
5/8: Cooling done
- Xend
4/25: Pumpdown
5/2: leak check
5/2: Cooling start
- Yend
4/4~: closing chamber and start pumping down.
4/10: Cooling starts.
5/8: Cooling done
- April: Measurement of TF, payload diagonalization on ITMX
- End of April~: Y arm commissioning
- ~End of May: FPMI commissioning
Note
Night work
Weekend
Report of work
- Height adsustment: Target is ITMY 6mm upper, ITMX 5mm lower.
- One of the stepping motor did not work. It will be checked today.
- ITMY adjustment was done. ITMX height changed ~2mm.
- ETMY cables to coil was checked. It was found that One of the pair was flipped, and they were swapped.
- COM: After hight adjustment, IFO will be aligned again. Some lock acquisition will be tried again.
Work plan
DGS: Maintenance will be planned for adding cards to k1omc. -> go to the safe mode for all the dolphin connected VIS.
- In the next week, several other PCs(LSC, ASC, ALS) will have more cards.
KAGRA/Commissioning/DailyWork << < 2024 / 9 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or Zoom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
70 |
2019/5/7 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools