21263
Comment:
|
22160
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
== Today's work plan: 2019/7/16 1PM - 2019/7/17 1PM == === Afternoon === * ETMY !L2Angle decoupling (Yamada, Nakano) * Check the schematic of the High Power Coil Driver (Fabian, Terrence) * Fix the CARM board boost issue (Enomoto) * Design a filter for DARM (Stefan) === Evening === * Y-arm mass lock trial (SB, EY, MN, et al) === Morning === * DGS maintenance * Power supply replacement of SR3 (Yamamoto) * ITM T-cam computer replacement (Yokozawa) * OMC extraction (Aso, et al) * Check dimensions around OSTM (Takahashi) ---- == Standing issues == * Y-arm lock * ETMY suspension control * !L2Angle decoupling * ETMY coil driver range increase * CARM board boost does not engage * DRMI lock stability * Model HOM-PHD signal distortion (Aso, Kokeyama) * Search for better Gouy phase in PRC * Initial alignment automation * Type-A related * Add aligned state in Guardian (Kokeyama) * Type-B related * SR3 Yaw motion is too large * Different ground level between the IO chasis and the AA filter box may be the reason * Replace the DC power supply * BS IM2TM transfer function measurement * Type-C related * Check dimensions around the OSTM * OSEM characterization for OSTM * OMC * Extract OMC * Check the OMC on the AS table * Laser safety * Debug the laser safety guardian ---- |
|
Line 8: | Line 58: |
* [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit?usp=sharing|Preparation for joining O3]] | |
Line 52: | Line 103: |
=== 2019/5/23(Thur.) === | === 2019/7/16(Tue.) === |
Line 55: | Line 106: |
* --(5/22: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS) )-- * 5/22-23: MZ release from PSL * 5/20-24: Exchanging cryo valves. * 6/8: Engineering run |
* ~7/31: Trial for DRMI with polarization. * 7/6~: Trial for mass lock |
Line 61: | Line 110: |
* --(5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm)-- * --(5/22AM~: tuned off shield cooler, finesse measurement for Xarm)-- |
|
Line 65: | Line 112: |
* --(5/2: Cooling start)-- * 5/29: Cooling done |
|
Line 69: | Line 114: |
* --(5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm)-- | * 7/4: Turbo pump on |
Line 72: | Line 117: |
* --(5/17~: tuned off ETMY cryostat cooler)-- * 5/24PM~ inject 100Pa Nitrogen. * 5/27 evacuation of Nitrogen. * 6/3-6/14: Installation of TMS for ETMY * 4/22-5/31: Yarm commissioning * 5/27-6/30: DRMI commissioning * 7/1-8/9: DRFPMI commissioning * 8/12-10/4: DRFPMI ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting |
* 7/4: Turbo pump on * Long term: * --(4/22-5/31: Yarm commissioning)-- * --(5/27-6/30: DRMI commissioning)-- * 7/1-8/9: FPMI/DRFPMI commissioning * 8/12-10/4: ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting |
Line 86: | Line 130: |
* COM: ETMY pitch has still range limit. One of the motor might reach the edge, and one more motor on the same DOF should work if somebody goes to EY and put more current on the driver. * There was request to CRY people to attend the morning or noon meeting. * CRY: Exchanging cryo valve during this week. |
|
Line 95: | Line 137: |
* CRY: ITMX cryostat cooler and shield cooler were stopped yesterday. Outgas pressure was normal. * CRY: ITMY cryostat cooler was stopped yesterday. Outgas pressure was normal. * CRY: ETMY Shield cooler was stopped yesterday and there was a big increment of pressure. It means ETMY may have some contamination. * IOO: MZ was released from the main path of PSL. * IOO team is still woking on realignment after removing MZ. Unexpected large beam shift by removing BS happened. * Type Bp: Cleaned aroundf PR2. * Type Bp: Stepping motor did not work on PR suspensions GAS filter. * Type B, Bp: Checking for LVDT for PR2 SR2 and BS * Type B: It was found that loose cable connection on H3 coil for RM of SR2. It was fixed. * DGS: We added BIO cards to k1lsc0. However it turned out that rebooting k1lsc always fails. Actually it was needed to shutdown to recover. V3 PC seems to have some problem. * DGS: Maintenance work for adding BIO cards. * DGS: Camera server maintenance. If you need camera, please use k1cam1. |
* OMC: Beam spot on mirror moved. One (or more) of the mirrors seems to be misaligned. OMC will be pulled tomorrow. * Y arm: 20dB suppression on LSC below 1Hz was seen on mass lock trial. * Opleve control was slightly changed from IM control to TM control. * High frequency is limited by noise. Needs high power coil driver modification. * Type B: H2 on SR3 was noisy, but needs more time to investigate it. * 80mHz peak was reduced by changing damping setting. * RTPC for ASC and ALS were dead somehow. |
Line 116: | Line 147: |
* CRY: Repairing work for cooler valve will finish today. The last item is for ITMY shield cooler. * COM: Finesse will be done tonight or tomorrow morning, depending on progress of IOO work. |
|
Line 132: | Line 161: |
||75||2019/7/16||[[KAGRA/Commissioning/Weekly/20190716/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190716/Minute|Minute]]|||| ||74||2019/7/2||[[KAGRA/Commissioning/Weekly/20190702/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190702/Minute|Minute]]|||| ||73||2019/6/25||[[KAGRA/Commissioning/Weekly/20190625/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190625/Minute|Minute]]|||| ||72||2019/5/28||[[KAGRA/Commissioning/Weekly/20190528/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190528/Minute|Minute]]|||| |
|
Line 208: | Line 241: |
* 2019/6/11: Summery meeting for E Run 1 [[/Meetings/Others/20190611/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190611|Minute]] * 2019/6/5: Meeting for E Run on 6/8 [[/Meetings/Others/20190608/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190608|Minute]] |
KAGRA Commissioning Wiki
Today's work plan: 2019/7/16 1PM - 2019/7/17 1PM
Afternoon
ETMY L2Angle decoupling (Yamada, Nakano)
- Check the schematic of the High Power Coil Driver (Fabian, Terrence)
- Fix the CARM board boost issue (Enomoto)
- Design a filter for DARM (Stefan)
Evening
- Y-arm mass lock trial (SB, EY, MN, et al)
Morning
- DGS maintenance
- Power supply replacement of SR3 (Yamamoto)
- ITM T-cam computer replacement (Yokozawa)
- OMC extraction (Aso, et al)
- Check dimensions around OSTM (Takahashi)
Standing issues
- Y-arm lock
- ETMY suspension control
L2Angle decoupling
- ETMY coil driver range increase
- CARM board boost does not engage
- ETMY suspension control
- DRMI lock stability
- Model HOM-PHD signal distortion (Aso, Kokeyama)
- Search for better Gouy phase in PRC
- Initial alignment automation
- Type-A related
- Add aligned state in Guardian (Kokeyama)
- Type-B related
- SR3 Yaw motion is too large
- Different ground level between the IO chasis and the AA filter box may be the reason
- Replace the DC power supply
- BS IM2TM transfer function measurement
- SR3 Yaw motion is too large
- Type-C related
- Check dimensions around the OSTM
- OSEM characterization for OSTM
- OMC
- Extract OMC
- Check the OMC on the AS table
- Laser safety
- Debug the laser safety guardian
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM, 1PM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/7/16(Tue.)
Schedule
- ~7/31: Trial for DRMI with polarization.
- 7/6~: Trial for mass lock
- ITMX
- ETMX
- ITMY
- 7/4: Turbo pump on
- ETMY
- 7/4: Turbo pump on
- Long term:
4/22-5/31: Yarm commissioning
5/27-6/30: DRMI commissioning
- 7/1-8/9: FPMI/DRFPMI commissioning
- 8/12-10/4: ASC
- 10/7-11/15: Post Commissioning
- 11/18-12/13: Noise hunting
Note
Night work
Weekend
Report of work
- OMC: Beam spot on mirror moved. One (or more) of the mirrors seems to be misaligned. OMC will be pulled tomorrow.
- Y arm: 20dB suppression on LSC below 1Hz was seen on mass lock trial.
- Opleve control was slightly changed from IM control to TM control.
- High frequency is limited by noise. Needs high power coil driver modification.
- Type B: H2 on SR3 was noisy, but needs more time to investigate it.
- 80mHz peak was reduced by changing damping setting.
- RTPC for ASC and ALS were dead somehow.
Work plan
KAGRA/Commissioning/DailyWork << < 2024 / 10 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or Zoom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)