Differences between revisions 7 and 9 (spanning 2 versions)
Revision 7 as of 2019-12-25 12:03:30
Size: 776
Editor: miyoki
Comment:
Revision 9 as of 2019-12-25 12:06:18
Size: 946
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
||FFU vibration investigation|| Stop FFUs according to [[KAGRA/EngineeringRun/ER191217_24/postERtrial| post ER action ]] || - Check FFUs influence || -[[ |klog***]] ||

FCL Themes, Actions and Goals

Theme

Targets

Goals

Results and Homeworks for future

Temperature fluctuation monitoring 
and remote adjustment

Monitor: Use PEM' monitors
Control: two heaters in the corner station
Control: two heaters in the Yend station

- Get temp change without any human action in KAGRA
- Adjust temp within +/- 0.1C

-klog12300

Water situation monitoring

Sent water amount data automatically
via e-mail to FLC members

- Stable mail sending

- no problems

Air Compressor Mitigation

Stop air compressor btw IXC and IXA

- Check removal of excitation and data quality enhancement

-klog***

FFU vibration investigation

Stop FFUs according to post ER action

- Check FFUs influence

-klog***

KAGRA/EngineeringRun/ER191217_24/FCL (last edited 2019-12-25 13:14:19 by miyoki)