Differences between revisions 9 and 10
Revision 9 as of 2019-12-10 14:53:25
Size: 342
Editor: miyoki
Comment:
Revision 10 as of 2019-12-10 14:53:45
Size: 342
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
|| Tidal and Alignment drift evaluation || LSC/ASC Control Loop evaluation || -[[ |klog***]] || || Tidal and alignment drift evaluation || LSC/ASC Control Loop evaluation || -[[ |klog***]] ||

IFO Themes, Actions and Goals

Theme

Targets

Results and Homeworks for future

IFO stable operation

Longer locking

-klog***

IFO locking

Reliable and quick recovery

-klog***

Tidal and alignment drift evaluation

LSC/ASC Control Loop evaluation

-klog***

KAGRA/EngineeringRun/ER191217_24/IFO (last edited 2019-12-25 13:10:25 by miyoki)