Differences between revisions 1 and 15 (spanning 14 versions)
Revision 1 as of 2019-12-09 17:46:31
Size: 9
Editor: miyoki
Comment:
Revision 15 as of 2019-12-09 17:59:12
Size: 783
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

||'''Theme'''|| '''Targets''' || '''Goals '''||'''Method'''||'''Results and Homeworks for future''' ||
|| RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||RRT composes of <<BR>>– Local Run Coordinator = S.Miyoki<<BR>>– ISC on-call as commissioning/detector expert = Operator Shift members<<BR>>– Operator = Collaborator Shift Members<<BR>>– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>>– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators|| -klog ||

'''Task definition'''<<BR>>
  * Local Run Coordinator:
  * ISC on-call as commissioning/detector expert:
  * Operato:
  * Detchar shifter:
  * Calibration exper:
  1. RRT

Theme

Targets

Goals

Method

Results and Homeworks for future

RRT training for Alerts

Training for LV alerts and
action simulation

Smooth process

RRT composes of
– Local Run Coordinator = S.Miyoki
– ISC on-call as commissioning/detector expert = Operator Shift members
– Operator = Collaborator Shift Members
– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators
– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators

-klog

Task definition

  • Local Run Coordinator:
  • ISC on-call as commissioning/detector expert:
  • Operato:
  • Detchar shifter:
  • Calibration exper:

KAGRA/EngineeringRun/ER191217_24/forLV (last edited 2019-12-09 18:09:49 by miyoki)