Differences between revisions 12 and 13
Revision 12 as of 2019-12-09 17:57:50
Size: 677
Editor: miyoki
Comment:
Revision 13 as of 2019-12-09 17:57:59
Size: 676
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
  *
||'''Theme'''|| '''Targets''' || '''Goals '''||'''Method'''||'''Results and Homeworks for future''' ||
  *  ||'''Theme'''|| '''Targets''' || '''Goals '''||'''Method'''||'''Results and Homeworks for future''' ||
  1. RRT
    • ||

      Theme|| Targets || Goals ||Method||Results and Homeworks for future ||

RRT training for Alerts

Training for LV alerts and
action simulation

Smooth process

RRT composes of
– Local Run Coordinator = S.Miyoki
– ISC on-call as commissioning/detector expert = Operator Shift members
– Operator = Collaborator Shift Members
– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators
– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators

-klog

Task definition

  • Local Run Coordinator

KAGRA/EngineeringRun/ER191217_24/forLV (last edited 2019-12-09 18:09:49 by miyoki)